Verify ventilation performance with UK-wide Part F testing — so you achieve sign-off on programme and your team knows what to do when airflow falls short.
Tell us about your project and we’ll respond within one working day.
SustainPlan provides UK-wide ventilation testing to support Part F compliance at handover.
We verify airflow performance against commissioning targets, identify shortfalls quickly, and coordinate with your contractor and Building Control so testing does not become a sign-off bottleneck.
Building Regulations Part F requires ventilation testing before sign-off.
Your ventilation system is installed but has not been commissioned to the required performance.
You want to reduce the risk of Part F failures before the Building Control inspection.
Ventilation testing confirms that the ventilation system installed in a completed building delivers the design air flow rates to occupied spaces — a requirement under Approved Document F of the Building Regulations for all new residential buildings and for mechanical ventilation systems in non-domestic buildings.
Testing must be carried out at completion and results submitted to building control. Ventilation commissioning failures are common on residential schemes — particularly where heat recovery ventilation systems have been installed without adequate duct coordination, commissioning access, or balancing at installation. SustainPlan coordinates ventilation testing alongside the airtightness testing programme and SAP calculations as-built process, so that the ventilation strategy, air permeability result, and energy model all reflect the system as installed and commissioned.
"Ventilation testing for residential and commercial schemes UK-wide — compliant airflow verified, shortfalls resolved, sign-off coordinated with airtightness and EPC."
We verify measured airflow rates against the Part F minimum requirements for the ventilation system type — extract-only, MVHR, natural or mixed-mode. Results are documented with clear pass/fail outcomes per dwelling or zone.
MVHR systems are particularly sensitive to commissioning quality — duct sealing, balancing and filter condition all affect performance. We check that the system is delivering the design airflow rates before the test result is recorded.
The ventilation rate assumed in SAP calculations or SBEM calculations affects compliance outputs and EPC ratings. Where tested rates differ from modelling assumptions, we flag the discrepancy so compliance calculations can be updated consistently.
Ventilation failures are often caused by incomplete commissioning rather than system design faults. We provide a pre-test checklist so contractors can verify commissioning quality before the formal test — reducing the risk of avoidable failures.
In tight buildings, ventilation performance is critical to indoor air quality. Where airtightness testing is also required, we coordinate both tests so the interaction between envelope tightness and ventilation rates is understood.
For residential developments with multiple units or shared MVHR systems, coordinated testing across the programme helps identify systematic commissioning issues early so they can be resolved before testing reaches the full plot schedule.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For: For single dwellings or units needing Part F ventilation testing for Building Regulations sign-off.
You receive: Ventilation test result, pass/fail assessment and fix guidance if required
For: For residential developments with multiple units needing ventilation testing coordinated with the handover programme.
You receive: Scheduled multi-plot testing, fail diagnosis, fix coordination and updated compliance evidence.
For: For projects with MVHR systems where commissioning quality needs to be verified before the formal Part F test.
You receive: Pre-test MVHR commissioning check plus formal Part F testing — pass/fail with documentation.
SustainPlan provides ventilation testing for architects, developers, contractors and project managers on new build residential and commercial schemes requiring Part F compliance.
Most commonly needed at practical completion when Building Control sign-off depends on verified airflow performance.
Book ventilation testing once the ventilation system is installed and commissioned, but before final decoration restricts access.
For MVHR systems, allow time for balancing and commissioning before testing day. Coordinate with airtightness testing where both are required.
Confirm system type, plot schedule, commissioning status and programme dates.
Issue commissioning checklist to contractor to reduce avoidable failure risk.
Attend site, measure airflow rates and compare against Part F targets.
Issue results with pass/fail summary per dwelling or zone.
Where results fail, advise on fix priority and coordinate retest.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
Part F testing verifies that ventilation systems deliver the airflow rates required for Building Regulations compliance and occupant health. If you want to reduce risk, treat ventilation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Typically after commissioning and before handover. If you have airtightness testing scheduled, we can plan sequencing so evidence aligns. If you want to reduce risk, treat ventilation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
We can scope testing for common system types. Send your system details and we’ll confirm the appropriate test approach. If you want to reduce risk, treat ventilation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
We advise on likely causes (settings, balancing, duct issues) and coordinate a retest once fixes are complete. If you want to reduce risk, treat ventilation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Yes—ventilation assumptions can affect SAP calculations. We help align evidence so compliance is consistent. If you want to reduce risk, treat ventilation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk