Ventilation design for buildings defines the ventilation strategy, system type, airflow rates and control approach for each space — aligned with Part F, SAP or SBEM requirements and coordinated with airtightness testing.
SustainPlan delivers ventilation design that can be verified at commissioning and will pass ventilation testing at handover without last-minute adjustments.
You need this if the project has an airtightness target that requires mechanical ventilation — and the ventilation strategy, system type and airflow rates have not yet been confirmed.
You need this if SAP or SBEM modelling has been produced and the ventilation design needs to match the system type, heat recovery rate and specific fan power assumptions used in the model.
Ventilation design determines how fresh air is supplied to occupied spaces, how stale air and moisture are extracted, and how the ventilation system integrates with the heating strategy and the building envelope. For residential buildings, the ventilation design directly affects the SAP calculations outcome — the ventilation heat loss coefficient and heat recovery efficiency are significant inputs. For non-domestic buildings, ventilation design affects the SBEM calculations compliance margin and the TM52 or TM54 operational energy assessment. SustainPlan produces ventilation design coordinated with the overheating assessment, the airtightness testing target, and the energy compliance strategy — ensuring that the ventilation system specified achieves the required indoor air quality, energy performance, and Building Regulations Part F compliance in the as-built condition.
"Used by architects, developers and project teams across the UK on planning submissions from initial feasibility through to discharge of conditions"
The right ventilation strategy depends on building type, airtightness target, energy performance obligations and occupant control requirements. We evaluate MVHR, mechanical extract, natural ventilation and hybrid options against the project’s specific constraints and recommend a strategy that meets Part F, SAP or SBEM requirements without unnecessary complexity.
Ventilation airflow rates for residential projects are governed by Part F of the Building Regulations. We calculate supply and extract rates by room, balance total flows across the dwelling, and produce a schedule that the commissioning engineer can verify against at handover — so the ventilation testing result is predictable rather than uncertain.
Ductwork that is undersized creates noise, restricts airflow and causes commissioning failures. Ductwork that is poorly sealed loses pressure and fails airtightness interaction tests. We size and route ductwork based on the design airflow rates and specify the sealing class required for the airtightness target, so the system is built to perform rather than designed to a minimum.
Specific fan power (SFP) is an input to SAP and SBEM energy modelling. If the installed fan has a higher SFP than the modelled assumption, the building’s calculated energy performance will be optimistic. We specify SFP against the modelling inputs and flag substitution risks so that value engineering does not inadvertently break the compliance position.
Ventilation controls determine real-world indoor air quality. We define the control strategy — boost operation, trickle rates, humidity-sensing, CO₂ demand control, occupant override — and document it in a form that the installer and commissioner can follow, so the system operates as designed rather than being left in default settings that don’t reflect the design intent.
Ventilation testing at handover verifies that the installed system delivers the designed airflow rates. Systems that fail testing delay practical completion. We structure the ventilation design around the testing requirements: balanced flows, accessible measurement points, commissioning sheets that match the test protocol, and a commissioning strategy that can be verified against the design.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For teams who need ventilation strategy, system type and airflow rates confirmed before detailed design and ductwork coordination progresses.
Includes: ventilation strategy selection, airflow rate schedule, Part F or SBEM compliance route, key ductwork interface notes.
Best for: RIBA Stage 2, residential and commercial schemes at early design stage, projects where ventilation system type is unconfirmed.
For teams who are in active design development and need detailed ventilation design coordinated with ductwork layout, airtightness target and energy modelling.
Includes: all Option A outputs plus full ductwork design, sizing calculations, sealing specification, commissioning sheets and SAP/SBEM alignment.
Best for: RIBA Stage 3–4, schemes in procurement, projects where the ventilation package needs to be specification-ready and coordinated with the mechanical and airtightness scope.
For teams who are approaching handover and need ventilation commissioning support, testing coordination and sign-off documentation.
Includes: commissioning readiness review, ventilation testing coordination, commissioning sheet completion, post-test documentation.
Best for: pre-handover stage, schemes approaching practical completion, projects with ventilation testing required before occupation.
Ventilation design is used by architects, developers and contractors who need ventilation systems designed, specified and coordinated with the airtightness and energy compliance requirements of the project.
We work with teams on residential, commercial and mixed-use schemes where ventilation performance is material to indoor air quality, energy compliance and handover testing. The scope is structured around the project’s actual airtightness target and SAP or SBEM obligations — not a generic specification that ignores the interaction between airtightness and ventilation.
The most effective time to commission ventilation design is at RIBA Stage 2, when system selection and airflow rate strategy can still influence the ductwork layout, ceiling void allocation and MEP coordination.
Ventilation decisions made early protect the airtightness target and ensure the SAP or SBEM model remains consistent with the installed system. Commissioning a ventilation design after ductwork routes are fixed often means the design is constrained by space decisions that make the required airflow rates difficult to achieve.
Confirm whether Ventilation Design Strategy is required and what ‘good’ looks like for your local authority and scheme.
Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.
Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.
Produce the report in a format that slots into your submission pack cleanly and defensibly.
Respond to clarifications and help you move from submission to decision/conditions efficiently.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.
Cost depends on building size, system complexity, number of unit types (for residential schemes) and the extent of coordination with airtightness and energy modelling. A straightforward MVHR design for a residential development with standard unit types is simpler than a mixed-use scheme with multiple ventilation strategies across different zones. A scoping call is the fastest way to define what is needed and get a reliable cost.
SAP calculations use ventilation system type, specific fan power and heat recovery efficiency as inputs. SBEM modelling uses similar inputs for non-domestic schemes. If the installed ventilation system has a higher SFP or lower heat recovery rate than the modelled assumption, the energy compliance position will be worse than predicted. We specify ventilation design against the modelling inputs from the outset so the specification and the energy model are consistent.
Airtightness testing verifies the building fabric seal; ventilation testing verifies that the system delivers the designed airflow rates. Both depend on the ventilation design: the ductwork must be sealed to the correct sealing class for the airtightness target, and the system must be designed to deliver balanced airflows that can be measured and verified at the commissioning stage. We design with both testing requirements in view.
Latest drawings including floor plans, sections and reflected ceiling plans, airtightness target, SAP or SBEM modelling outputs (if produced), any MVHR unit already selected, programme milestones and ventilation testing date. For residential schemes, room dimensions and areas are needed for the airflow rate calculations. For commercial schemes, occupancy profiles and internal load assumptions are also required.
Ventilation system substitutions — MVHR unit changes, fan substitutions, ductwork material changes — are common during procurement. The risk is that the substituted product has a higher SFP, lower heat recovery efficiency or incompatible controls, breaking the SAP or SBEM modelling assumptions and potentially failing the ventilation test at handover. We assess each proposed substitution and flag where a change requires the energy model to be updated or the commissioning strategy to be revised.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk