When a transport statement is required, we confirm the right level of assessment, coordinate assumptions with your submission pack, and produce a clear, defensible report.
Tell us about your project and we’ll respond within one working day.
A transport statement supports a planning submission by explaining access arrangements, likely trip generation and any transport impacts at a proportionate level.
SustainPlan confirms whether a statement or assessment is required, scopes the right methodology, and produces a planning-ready report — coordinated with your wider submission pack. UK-wide.
Your local authority validation checklist or case officer has requested transport evidence. You need to confirm whether a lighter statement or a more detailed assessment is required. Access, parking or servicing arrangements are central to your planning submission.
Transport statements and transport assessments are required by local planning authorities when proposed developments are likely to generate significant levels of vehicular movement or when the site has specific access constraints. The threshold for requiring a transport assessment rather than a transport statement depends on development type, scale, and local authority policy.
SustainPlan coordinates the transport statement with your wider planning pack — ensuring trip generation assumptions are consistent across disciplines, that active travel commitments are credible, and that the access strategy reflects the highway authority’s pre-application guidance. Coordinated transport documentation reduces the risk of late objections from the local highway authority.
"Used by architects, developers and contractors across the UK — from pre-application stage through to planning submission on residential, commercial and mixed-use schemes."
Getting the level wrong wastes time or risks refusal. We confirm the proportionate route during the triage call, based on scheme scale and local authority requirements.
Estimates need to reference recognised data sources and be calibrated to your scheme type. We document methodology so planning officers can follow the logic — and challenge it if necessary.
Where parking is central to the scheme, we coordinate with parking surveys to ensure evidence is consistent and cross-referenced. No document should contradict another on counts or assumptions.
Where impacts are identified, we propose mitigation that is practical and deliverable. Measures that are difficult to implement or monitor tend to become conditions — we design those out.
Transport assumptions connect to site layout, servicing, drainage and ecology. We align across the pack so reviewers see a consistent picture and the methodology is defensible.
Transport conditions often include travel plan requirements and highway contributions. We structure the planning-stage report to flag what to expect post-consent and make condition discharge straightforward.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For: For schemes where transport evidence is required but scale or impacts are limited.
You receive: Transport statement with access description, trip generation summary and proportionate mitigation.
For: For schemes where parking is central to the planning submission and evidence must be cross-referenced.
You receive: Transport statement combined with parking survey evidence — coordinated and presented as a single pack.
For: For larger developments or schemes with significant transport impacts requiring more detailed evidence.
You receive: Full transport assessment — detailed trip generation, impact analysis and mitigation programme.
SustainPlan produces transport statements for architects, developers and contractors who need transport evidence for planning. This service is most commonly used when a validation checklist includes transport requirements or when access, parking or servicing arrangements are a key part of the planning strategy.
Commission before planning submission, once access and parking intent is broadly understood. Early scoping confirms whether a lighter statement or a fuller assessment is required — and prevents design changes being driven by transport evidence that could have been anticipated sooner.
Confirm whether a transport statement or assessment is required, and agree the proportionate methodology.
Agree inputs, access and parking assumptions, and align with programme dates.
Produce a planning-ready transport statement with documented methodology and assumptions.
Align assumptions and commitments with the wider planning pack.
Issue the finalised report and respond to planning questions or conditions.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.
A proportionate planning report explaining access arrangements, likely transport demand and any mitigation required. Usually requested by the local authority validation checklist or case officer when a development changes access, parking or trip generation.
A transport statement is lighter-touch and proportionate. A transport assessment is more detailed, typically required for larger schemes or complex impacts. We confirm which applies during the triage call — so you do not over-produce or risk refusal by under-producing.
Before planning submission, once access and parking intent is broadly understood. Early scoping prevents redesign driven by transport evidence and confirms the right level of assessment before the full pack is assembled.
Site address and boundary, basic drawings, proposed use and quantum, access and parking intent, and any pre-application notes or officer comments.
A well-scoped transport statement reduces objections and avoidable conditions by demonstrating proportionate evidence and practical mitigation. Getting the scope right — not too little, not too much — is where most of the value sits.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk