Sustainability Statement — Planning-Ready, Deliverable, Defensible

A sustainability statement that supports your planning submission — with clear commitments, deliverable pathways and joined-up coordination across energy, carbon and site context.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

A sustainability statement summarises how a development addresses relevant sustainability themes — energy, carbon, comfort, ecology and transport — at a level proportionate to the scheme.

SustainPlan produces planning-ready statements with clear commitments, coordinated assumptions and deliverable pathways, commonly packaged with an energy statement and whole life carbon assessment.

You need this if...

Your local authority validation checklist requires a sustainability statement. Your scheme needs a credible sustainability narrative that is planning-compatible and deliverable. You want commitments that are proportionate — not ones that create conditions or delivery risk later.

Local planning authorities require a sustainability statement when schemes pass set size thresholds or fall within energy policy areas. Requirements vary — some authorities follow national planning policy, others apply London Plan standards, and many combine both with their own Local Plan policies. A poorly scoped sustainability statement creates planning conditions; a well-scoped one demonstrates compliance and removes objections before they arise. SustainPlan prepares sustainability statements that map your scheme accurately against the applicable policy framework — covering energy performance, water efficiency, materials, ecology, and adaptation to climate change — with clear signposting to the technical reports that support each commitment.

What the scope covers?

"Used by architects, developers and project managers across the UK — aligning sustainability statements with energy, carbon and compliance work from RIBA Stage 1 to handover."

What you receive

What we need from you

Technical deep dive

01

Policy Scoping

Requirements vary by authority and scheme type. We confirm what the local authority expects before writing a word — so the statement addresses policy directly, not generically.

02

Energy and Carbon Alignment

A sustainability statement that contradicts the energy statement creates planning questions. We coordinate both documents from shared assumptions so reviewers see a coherent, defensible picture.

03

Commitment Calibration

Commitments that are too vague get questioned. Commitments that are too prescriptive create delivery risk. We set the right level of ambition for planning stage — clear, proportionate and defensible.

04

Supporting Assessment Integration

Where ecology, drainage, noise and transport apply, we reference them consistently across the pack. Contradictions between documents are a common source of avoidable conditions.

05

Whole Life Carbon and Circular Economy

Where policy or client targets require it, we align the sustainability statement with whole life carbon and circular economy reporting from the outset — not retrospectively.

06

Deliverability Pathway

Sustainability statements often create conditions that are hard to discharge later. We write with the construction and handover stage in mind — not just the planning officer's checklist.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Pre-Application Sustainability Position

For: For schemes at early stage needing a proportionate sustainability narrative ahead of a pre-application meeting.

You receive: Concise sustainability position paper that shapes the planning strategy and identifies gaps early.

Option B - Most Common

Full Planning Submission Statement

For: For projects where a sustainability statement is a validation requirement or client expectation.

You receive: Complete sustainability statement — policy context, coordinated commitments, deliverable pathways.

Option C

Complex Scheme or Higher-Scrutiny Authority

For: For schemes where sustainability policy requirements are layered or the statement is central to the planning strategy.

You receive: Full sustainability statement with closer coordination across energy, carbon, ecology and constraints reporting.

Not sure which option fits your scheme?

Who it's for and when to use it

Who it’s for:

SustainPlan produces sustainability statements for architects, developers and project managers who need a credible sustainability narrative for planning. This service is most commonly used when a validation checklist requires a sustainability statement or when a scheme has sustainability commitments that need to be translated into planning-compatible language.

Best timing to commission

Commission before planning submission, once the sustainability approach is broadly understood. Pre-application statements are also valuable for shaping the planning strategy early — particularly where sustainability requirements are likely to be a point of scrutiny from the local authority.

Our process

1

Scope call

Confirm what the authority expects and what is proportionate for the scheme type and planning context.

2

Inputs check

Identify gaps, agree assumptions and align with energy and carbon work already in progress.

3

Draft statement

Produce a structured statement with clear commitments and a deliverable pathway.

4

Coordination

Align assumptions and commitments with energy statement, carbon assessment and supporting reports.

5

Final issue and support

Issue the finalised statement and respond to planning clarifications or conditions.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 1 of 4 — Feasibility & Planning

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.