Sound Insulation Testing — Part E Compliance at Handover

UK-wide Part E sound insulation testing with fast reporting and practical fix advice — so sign-off is not delayed by failures that could have been anticipated.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

SustainPlan delivers UK-wide sound insulation testing to support Part E compliance at handover.

We coordinate testing to your programme, provide clear pass/fail outcomes, and — where issues arise — advise on practical fixes and coordinate retesting so sign-off is not delayed by avoidable failures.

You need this if...

Building Regulations Part E requires sound insulation testing before handover sign-off. 

You want to reduce the risk of failure before testing is booked. 

You have failed a test and need fast diagnosis and retest coordination.

Sound insulation testing is required under Approved Document E of the Building Regulations for new-build residential buildings and for conversions of commercial or mixed-use buildings to residential use. Testing must be carried out by a suitably qualified acoustic engineer using the methodology set out in BS EN ISO 10140 for laboratory testing and BS EN ISO 16283 for field measurement. 

Failed sound insulation tests create programme risk — remediation work, retesting, and potential delays to handover and occupation. SustainPlan coordinates sound insulation testing against the construction programme — with pre-completion checks to identify risk areas before formal testing, and coordination with the SAP calculations and energy performance certificate sign-off process so that handover milestones are not held up.

What the scope covers?

"Part E sound insulation testing for residential and commercial schemes across the UK — preparation guidance, testing, fail diagnosis and retest, all coordinated with programme."

What you get

What we need from you

Technical deep dive

01

Airborne Sound Insulation Testing

We test separating walls and floors between dwellings or occupancies against Part E performance targets. Airborne sound insulation (DnTw) is measured using a calibrated sound source and receiver, producing a result that is directly comparable to the standard.

02

Impact Sound Insulation Testing

Impact sound testing measures the transmission of footfall and impact noise through floors. For apartments and multi-occupancy buildings, impact insulation (L'nTw) is typically required as well as airborne testing.

03

Pre-Test Preparation Guidance

Most failures are caused by predictable issues — unsealed services penetrations, incomplete resilient layers, or flanking paths that were not addressed during construction. We share a preparation checklist so site can act before testing day.

04

Fail Diagnosis and Fix Prioritisation

If a test fails, we identify the most likely cause based on the result data and site observations. Targeted remediation is faster and cheaper than speculative sealing — we give the contractor a prioritised fix list, not a generic instruction.

05

Multi-Plot Scheduling

For residential developments, scheduling tests across plots and floors allows the team to learn from early results. Repeat failures on the same junction type are usually identifiable and fixable across the remaining plots.

06

Airtightness and Ventilation Coordination

At handover, sound, airtightness and ventilation tests often need to be coordinated across the same plots. We align testing schedules where multiple tests are required so site access is not repeatedly mobilised for individual tests.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Single Unit or Element

For: For a single dwelling or separating element needing Part E sound insulation testing.

You receive: Test result, pass/fail summary and fix advice if required.

Option B - Most Common

Multi-Plot Development

For: For residential or commercial developments with multiple units requiring scheduled testing across the programme.

You receive: Scheduled multi-plot testing, coordinated with the handover programme, fail diagnosis and retest included.

Option C

Fail Recovery and Retest

For: For projects that have failed Part E sound insulation testing and need fast diagnosis, remediation guidance and retest.

You receive: Failure diagnosis, prioritised fix list, retest coordination and updated compliance evidence.

Ready to book, or want preparation guidance before testing?

Who it's for and when to use it

Who it’s for:

SustainPlan provides sound insulation testing for architects, developers, contractors and project managers on new build and refurbished residential and commercial schemes requiring Part E compliance.

Most commonly needed at practical completion when Building Control sign-off depends on tested performance.

Best timing:

Book testing once separating elements are complete and finishes are in place, but while access is still practical.

For multi-plot developments, schedule early plots as soon as they are ready to catch construction quality issues before they affect the remainder of the programme.

Our process

1

Scope and booking

Confirm plot schedule, element types, programme dates and handover requirements.

2

Pre-test guidance

Issue preparation checklist to site so avoidable failures are addressed in advance.

3

Testing

Attend site, conduct airborne and impact testing per the relevant standard.

4

Reporting

Issue results with pass/fail summary per element.

5

Fail support

If results fail, provide diagnosis and coordinate retest once remediation is complete.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 4 of 4 — Handover & Existing Buildings

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.