UK-wide Part E sound insulation testing with fast reporting and practical fix advice — so sign-off is not delayed by failures that could have been anticipated.
Tell us about your project and we’ll respond within one working day.
SustainPlan delivers UK-wide sound insulation testing to support Part E compliance at handover.
We coordinate testing to your programme, provide clear pass/fail outcomes, and — where issues arise — advise on practical fixes and coordinate retesting so sign-off is not delayed by avoidable failures.
Building Regulations Part E requires sound insulation testing before handover sign-off.
You want to reduce the risk of failure before testing is booked.
You have failed a test and need fast diagnosis and retest coordination.
Sound insulation testing is required under Approved Document E of the Building Regulations for new-build residential buildings and for conversions of commercial or mixed-use buildings to residential use. Testing must be carried out by a suitably qualified acoustic engineer using the methodology set out in BS EN ISO 10140 for laboratory testing and BS EN ISO 16283 for field measurement.
Failed sound insulation tests create programme risk — remediation work, retesting, and potential delays to handover and occupation. SustainPlan coordinates sound insulation testing against the construction programme — with pre-completion checks to identify risk areas before formal testing, and coordination with the SAP calculations and energy performance certificate sign-off process so that handover milestones are not held up.
"Part E sound insulation testing for residential and commercial schemes across the UK — preparation guidance, testing, fail diagnosis and retest, all coordinated with programme."
We test separating walls and floors between dwellings or occupancies against Part E performance targets. Airborne sound insulation (DnTw) is measured using a calibrated sound source and receiver, producing a result that is directly comparable to the standard.
Impact sound testing measures the transmission of footfall and impact noise through floors. For apartments and multi-occupancy buildings, impact insulation (L'nTw) is typically required as well as airborne testing.
Most failures are caused by predictable issues — unsealed services penetrations, incomplete resilient layers, or flanking paths that were not addressed during construction. We share a preparation checklist so site can act before testing day.
If a test fails, we identify the most likely cause based on the result data and site observations. Targeted remediation is faster and cheaper than speculative sealing — we give the contractor a prioritised fix list, not a generic instruction.
For residential developments, scheduling tests across plots and floors allows the team to learn from early results. Repeat failures on the same junction type are usually identifiable and fixable across the remaining plots.
At handover, sound, airtightness and ventilation tests often need to be coordinated across the same plots. We align testing schedules where multiple tests are required so site access is not repeatedly mobilised for individual tests.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For: For a single dwelling or separating element needing Part E sound insulation testing.
You receive: Test result, pass/fail summary and fix advice if required.
For: For residential or commercial developments with multiple units requiring scheduled testing across the programme.
You receive: Scheduled multi-plot testing, coordinated with the handover programme, fail diagnosis and retest included.
For: For projects that have failed Part E sound insulation testing and need fast diagnosis, remediation guidance and retest.
You receive: Failure diagnosis, prioritised fix list, retest coordination and updated compliance evidence.
SustainPlan provides sound insulation testing for architects, developers, contractors and project managers on new build and refurbished residential and commercial schemes requiring Part E compliance.
Most commonly needed at practical completion when Building Control sign-off depends on tested performance.
Book testing once separating elements are complete and finishes are in place, but while access is still practical.
For multi-plot developments, schedule early plots as soon as they are ready to catch construction quality issues before they affect the remainder of the programme.
Confirm plot schedule, element types, programme dates and handover requirements.
Issue preparation checklist to site so avoidable failures are addressed in advance.
Attend site, conduct airborne and impact testing per the relevant standard.
Issue results with pass/fail summary per element.
If results fail, provide diagnosis and coordinate retest once remediation is complete.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
Part E testing checks that separating walls and floors achieve the required airborne/impact sound performance for Building Regulations compliance. If you want to reduce risk, treat sound insulation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Typically near completion once finishes are largely complete, but early enough that remediation is still practical if results fall short. If you want to reduce risk, treat sound insulation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Where applicable, yes. The test scope depends on building type, separating elements and the compliance route. If you want to reduce risk, treat sound insulation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
We provide practical remedial guidance and coordinate a retest window. Acting quickly is key to protecting handover dates. If you want to reduce risk, treat sound insulation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Often, yes—particularly where new dwellings are created. We’ll confirm requirements based on the project scope and Building Control expectations. If you want to reduce risk, treat sound insulation testing as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk