SBEM Calculations — Non-Domestic Compliance Without the Confusion

SBEM calculations to support non-domestic Part L compliance — scope confirmed early, fit-out boundary clarified, and submission-ready outputs aligned to your programme.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

SustainPlan delivers SBEM calculations UK-wide for commercial and non-domestic projects.

We confirm scope early — including fit-out boundary, systems specification and whether to follow the notional or actual route — keep iterations clean, and produce submission-ready outputs aligned to your completion programme.

You need this if...

Part L Building Regulations compliance requires SBEM evidence for a non-domestic building. 

The fit-out boundary and systems specification need to be confirmed before modelling starts. 

You need SBEM outputs that align with your EPC and airtightness testing programme.

SBEM calculations — the Simplified Building Energy Model — are used to demonstrate Part L compliance for new non-domestic buildings and extensions to non-domestic buildings in England and Wales. Like SAP calculations for residential, SBEM calculations require both a design stage submission and an as-built update at completion. The compliance margin achieved at design stage directly affects how much tolerance is available if specification or building fabric changes during construction. SBEM calculations must be closely coordinated with the mechanical and electrical design, the building envelope specification, and the lighting design — since all three significantly affect the TER/BER outcome. Early engagement allows compliance strategy to be resolved before tender rather than managed reactively during construction.

What the scope covers?

"SBEM calculations for commercial, industrial and mixed-use schemes across the UK — scope confirmed early, compliance delivered cleanly."

What you get

What we need from you

Technical deep dive

01

Fit-Out Boundary Confirmation

SBEM scope varies significantly depending on whether tenant fit-out is included in the base build or excluded. Getting the boundary wrong produces a compliance calculation that cannot be signed off. We confirm this before modelling starts.

02

Notional Building Route

SBEM compares actual building performance against a notional building baseline. We explain the compliance route clearly and document assumptions so the client team understands what is driving the result.

03

Systems and Fabric Coordination

SBEM performance depends on the combined effect of fabric U-values, glazing, lighting, HVAC and controls. We coordinate inputs across disciplines so the model reflects what is actually being specified.

04

Airtightness Test Coordination

Commercial buildings require airtightness testing and the result updates the as-built SBEM. We align the design-stage target with what is testable on site so the as-built calculation can be completed without surprises.

05

EPC Input Preparation

SBEM outputs feed directly into the commercial EPC at completion. We prepare EPC inputs alongside SBEM so Building Regulations sign-off and EPC issue are coordinated and neither is held up by the other.

06

BREEAM Energy Credits

Where BREEAM is also required, the SBEM model feeds into energy credit calculations. We align SBEM outputs with BREEAM credit requirements so the same modelling work supports both compliance and certification.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Shell and Core

For: For commercial schemes being delivered to a shell and core specification where tenant fit-out is excluded from the base build compliance scope.

You receive: Shell and core SBEM with scope note confirming fit-out boundary and EPC strategy.

Option B - Most Common

Full Building Design and As-Built

For: For fully specified commercial buildings requiring design-stage compliance evidence and as-built sign-off.

You receive: Full SBEM package — design-stage and as-built, with EPC coordination and airtightness test alignment.

Option C

BREEAM and SBEM Coordinated

For: For commercial schemes where SBEM outputs need to feed into BREEAM energy credit calculations without duplication.

You receive: Coordinated SBEM and BREEAM energy credit package with aligned modelling inputs.

Not sure how to scope SBEM for your commercial scheme?

Who it's for and when to use it

Who it’s for:

SustainPlan provides SBEM calculations for architects, developers and building services engineers on commercial and non-domestic schemes requiring Part L compliance evidence.

Most commonly used where fit-out boundary, systems specification or notional building route create scope uncertainty at the start of a project.

Best timing:

Commission at RIBA Stage 3 or 4 for design-stage SBEM, and at practical completion for as-built.

Confirming scope and fit-out boundary at the start prevents rework when the model needs to be updated to reflect what was actually installed.

Our process

1

Triage call

Confirm scope, fit-out boundary, building type and compliance route.

2

Scope confirmation

Clarify notional vs actual route, systems inputs and airtightness test requirements.

3

Design-stage SBEM

Produce compliance outputs with documented assumptions.

4

Iterations

Update as design and systems specification develop.

5

As-built SBEM and EPC

Complete following airtightness test and issue final compliance evidence.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 2 of 4 — Design & Compliance

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.