SAP Calculations — Part L Compliance Done Right, First Time

SAP calculations to support Part L compliance and sign-off — clear assumptions, practical iterations and submission-ready outputs aligned to your programme.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

SustainPlan delivers SAP calculations UK-wide with a joined-up approach that keeps fabric, thermal bridging and overheating assumptions consistent across compliance outputs.

We clarify scope early, work cleanly through iterations, and issue submission-ready documents aligned to your programme.

You need this if...

Building Regulations Part L sign-off requires SAP compliance evidence. 

Your fabric and thermal bridging assumptions need to be consistent across all outputs. 

You need SAP to work alongside overheating and airtightness results without creating contradictions.

SAP calculations are the Standard Assessment Procedure used for all new dwellings in England, Wales, and Scotland to demonstrate compliance with Part L of the Building Regulations and to produce the Energy Performance Certificate at completion. Calculations are required at design stage (Predicted Energy Assessment) and again at as-built stage when the dwelling is complete. SAP calculations must reflect the actual construction — U-values, thermal bridging, air permeability, heating system, renewables — so coordination between the energy assessor, the mechanical designer, and the building control body matters from the outset. Errors or assumptions in the design stage SAP calculations propagate to the as-built assessment and create compliance risk at the point of handover.

What the scope covers?

"SAP calculations for new-build residential schemes across the UK — clear compliance outputs, practical iterations and joined-up with thermal performance from design to sign-off."

What you get

What we need from you

Technical deep dive

01

Design-Stage and As-Built SAP

SAP is required at both design and as-built stages for Part L compliance. We produce both, maintaining consistency between them so changes between design intent and completion do not create unexplained compliance variances.

02

Fabric Input Alignment

SAP results are only as good as the fabric inputs. We align U-values, PSI values and airtightness assumptions across SAP and the calculations that support them — so compliance is based on what is actually being built.

03

Thermal Bridging and Appendix K

Using default Appendix K PSI values inflates compliance penalties where junctions are well-detailed. We flag where project-specific PSI-value calculations would improve SAP outcomes and help you decide whether they are cost-effective.

04

Overheating Consistency

SAP and overheating assessments share glazing, ventilation and fabric inputs. We align inputs from the start so a change to one output is reflected correctly in the other — preventing contradictions that attract Building Control queries.

05

Airtightness Test Coordination

Design-stage SAP is produced to a target airtightness value. As-built SAP is updated once the test is complete. We coordinate both stages so the target is realistic, the test is planned correctly, and sign-off is not delayed by a gap between assumed and measured performance.

06

EPC Input Preparation

SAP outputs feed directly into the new-build EPC. We prepare EPC inputs alongside SAP so the transition from design-stage to as-built EPC is straightforward — and Building Control sign-off is not held up by missing compliance evidence.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Design-Stage SAP

For: For projects at design stage where SAP is needed to confirm compliance intent and inform specification decisions.

You receive: Design-stage SAP with compliance summary, recommendations and EPC input preparation.

Option B - Most Common

Design and As-Built SAP

For: For projects progressing to completion where both design-stage and as-built compliance evidence is required.

You receive: Full SAP package — design-stage and as-built, with airtightness coordination and EPC sign-off support.

Option C

Coordinated SAP, Overheating and Thermal Bridging

For: For schemes where SAP, overheating and PSI-value calculations all need to be internally consistent.

You receive: Joined-up compliance package — all outputs from aligned inputs, reducing iterations and programme risk.

Not sure what SAP you need at your stage?

Who it's for and when to use it

Who it’s for:

SustainPlan provides SAP calculations for architects, developers and contractors on new-build residential schemes requiring Part L compliance.

Most commonly commissioned alongside U-value calculations and overheating assessment — particularly where thermal bridging and airtightness are being actively designed rather than defaulted.

Best timing:

Commission at RIBA Stage 3 or 4 for design-stage SAP, and at practical completion for as-built SAP.

Commissioning design-stage SAP before specification is finalised allows fabric decisions to be informed by compliance outcomes rather than confirmed after commitment.

Our process

1

Triage call

Confirm scope, scheme type, design stage and compliance route.

2

Inputs alignment

Collect U-values, PSI values, heating and ventilation system details and airtightness target.

3

Design-stage SAP

Produce compliance outputs with documented assumptions and recommendations.

4

Iterations

Update SAP as design develops, maintaining consistent inputs across all compliance outputs.

5

As-built SAP and EPC

Update following airtightness test and issue final compliance evidence for sign-off.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 2 of 4 — Design & Compliance

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.