Measure how buildings actually perform in use — identify gaps between design intent and operational reality, and turn findings into improvements and lessons for the next project.
Tell us about your project and we’ll respond within one working day.
SustainPlan delivers UK-wide post occupancy evaluation (POE) to capture how buildings perform in real operation.
We identify gaps between design intent and actual performance, surface practical improvements for facilities teams, and produce clear reports that close the feedback loop and inform better design decisions.
You want to know whether the building is performing as designed and what to do if it is not.
BREEAM certification, a client brief or planning condition requires post occupancy evidence.
You want to learn from this building’s performance to improve the next project.
Post-occupancy evaluation closes the gap between design intent and operational performance — identifying why a building performs differently in use from how it was modelled and what interventions will bring it back into line. The performance gap between design-stage SAP calculations or TM54 operational energy assessment predictions and measured energy use is well documented, and in many cases is significant.
SustainPlan carries out post-occupancy evaluations that combine occupant feedback with metered energy data, building management system analysis, and targeted monitoring to diagnose the root causes of underperformance. Outputs feed directly into operational improvements, building manual updates, and future-project learning for design teams and developers seeking to close the gap between modelled and actual energy performance.
"Post occupancy evaluations for commercial and residential schemes across the UK — closing the gap between what was designed and what buildings actually deliver."
We compare actual in-use performance against design intent — energy consumption, internal temperatures, ventilation rates and occupant comfort. The gap between assumed and actual performance is where most improvement opportunities sit.
We review metered energy data and compare it against design-stage modelling assumptions. Where consumption is significantly higher than predicted, we identify the most likely causes and prioritise investigation.
Thermal comfort, air quality, acoustics and daylighting all affect building usability. We assess indoor environment quality through data review and occupant survey so operational issues are identified rather than assumed.
Buildings often underperform because controls are not set up correctly or because commissioning assumptions did not survive handover. We assess whether systems are operating as designed or whether controls require adjustment.
Occupant feedback provides evidence that cannot be captured through metered data alone. We design and run structured surveys that produce comparable data and highlight issues that are invisible in energy consumption figures.
POE findings are most valuable when they inform the next project. We structure the lessons learned output so it is useful to architects, engineers and clients making decisions on similar buildings.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For: For projects needing a light-touch performance review — energy data, brief occupant survey and key findings.
You receive: Rapid POE report with performance summary and priority improvement actions.
For: For projects where a comprehensive evaluation of energy, comfort and systems performance is required.
You receive: Full POE — performance gap analysis, occupant survey, improvement recommendations and lessons learned.
For: For projects where POE is a BREEAM credit requirement or a client or planning condition.
You receive: POE delivered to the required evidence standard with BREEAM credit inputs where applicable.
SustainPlan provides post occupancy evaluation for architects, developers, facility managers and building owners.
Most commonly used 12-18 months after handover when the building has been in operation long enough to produce meaningful performance data.
Commission 12-18 months after practical completion, once the building has settled into normal operation and occupants have experience with the building’s performance across different seasons.
Earlier commissioning is possible for rapid POE where prompt feedback is needed.
Confirm evaluation scope, access to energy data and occupant contact list.
Analyse energy consumption and compare against design-stage assumptions.
Design and run structured survey to capture comfort and environment feedback.
Identify performance gaps and diagnose likely causes.
Deliver POE report with improvement actions and lessons learned.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
POE evaluates how a building performs once occupied—comfort, energy, usability and operational outcomes—then turns findings into actions and lessons learned. If you want to reduce risk, treat post occupancy evaluation (POE) as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Once occupancy and operation have stabilised enough to show real patterns, but early enough that fixes can be implemented efficiently. If you want to reduce risk, treat post occupancy evaluation (POE) as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.They help, but you can start with what you have. We can incorporate EPCs and DECs as evidence inputs.
Not always. We can start with available data and scale the scope depending on what’s needed to answer the key questions. If you want to reduce risk, treat post occupancy evaluation (POE) as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Yes—POE often identifies controls and operational issues that drive unnecessary energy use, enabling targeted fixes. If you want to reduce risk, treat post occupancy evaluation (POE) as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
TM54 operational energy assessment predicts operational energy; POE checks real performance and helps calibrate future assumptions. If you want to reduce risk, treat post occupancy evaluation (POE) as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk