Planning Requirements Audit — Know What Applies Before You Submit

Maps the technical reports, sequencing and decision points your scheme needs — so you avoid refusal risk and late planning conditions.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

A planning requirements audit confirms what technical reports your scheme needs, when to commission them, and in what sequence.

 SustainPlan reviews scheme context and local authority expectations, identifies report triggers, and maps decision points — so you move from uncertainty to a clear, coordinated plan before submission.

You need this if...

Your case officer has issued a planning shopping list you need to unpick.  

You want to sequence reports correctly and avoid contradictions across the submission pack.  

You need to know what applies now vs what can wait until post-consent.

Most planning submissions encounter problems not because of what is included, but because of what is missing — or commissioned in the wrong order. Local authority expectations vary significantly by use class, site context, and planning policy area. Without a clear requirements map, schemes either over-commission (wasting time and cost on reports that are not needed) or under-commission (triggering planning conditions that delay consent). 

A planning requirements audit resolves this at pre-application stage, before design decisions are locked and before programme pressure limits your options. The result is a proportionate, coordinated submission pack where every report is in sequence, every assumption is aligned, and nothing is missed.

What the scope covers?

"Used by architects, developers and contractors across the UK on projects from pre-application stage through to final submission — RIBA Stage 1 to handover."

What you receive​

What we need from you

Technical deep dive

01

Local Authority Mapping

We confirm what your specific authority expects — not a generic checklist. Requirements vary significantly between authorities, and what works for one does not automatically apply to another.

02

Scheme Trigger Analysis

We identify which reports your scheme triggers based on use class, scale and site context. Not every scheme needs every report — proportionate scoping protects time and cost.

03

Report Sequencing Logic

Some assessments must inform design decisions before the scheme moves forward. We identify which those are and flag them before they become programme constraints rather than opportunities.

04

Pack-Wide Assumption Alignment

We lock assumptions across the submission pack at the start so every report reads from the same baseline. Contradictions between documents create planning questions that are avoidable.

05

Post-Consent Phasing

Some reports can be staged for discharge of conditions rather than submitted at planning. We separate what must be done now from what can wait — protecting programme and cost.

06

Programme Integration

Planning programmes shift. We structure the audit so it remains useful through design iterations — not just at one fixed point in time.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Pre-Application Clarity

For: For teams at scheme inception who need to understand what applies before committing to a full planning pack.

You receive: Requirements map, sequencing plan and input checklists.

Option B - Most Common

Submission Pack Coordination

For: For teams who have received a planning shopping list and need to confirm what is required, sequence reports correctly, and align assumptions.

You receive: Full coordination service — requirements confirmed, sequencing agreed, assumptions locked.

Option C

Post-Consent Catch-Up

For: For projects arriving mid-stream or post-consent where scope was not mapped early.

You receive: Gap analysis, risk assessment and discharge-of-conditions route-map.

Not sure which option fits your stage?

Who it's for and when to use it

Who it’s for:

SustainPlan works with architects, developers, contractors and project managers who need clarity before a planning submission.

This service is most used when a case officer has flagged requirements or when a team is assembling a planning pack and needs to confirm scope, sequence and assumptions before commissioning individual reports.

Best timing:

Commission at pre-application stage, before the full planning pack is assembled — the earlier the better. Audit outputs can shape design decisions and reduce rework.

If you are arriving mid-project, the audit works as a gap analysis and helps sequence what is still needed.

Our process

1

Triage call

Confirm whether a planning requirements audit is needed and what your local authority expects for the scheme.

2

Assumptions lock

Align drawings, scheme description, programme dates and pack-wide assumptions before analysis begins.

3

Analysis and mapping

Confirm what reports apply, when they are needed, and what each must address at this scheme stage.

4

Planning-ready output

Deliver the requirements map, sequencing plan and input checklists in a usable format.

5

Submission support

Respond to planning queries and help sequence the full pack through to consent.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 1 of 4 — Feasibility & Planning

Let's Work Together