Know what your submission needs, what can be phased, and where the risk sits — before you spend on a full planning pack.
Tell us about your project and we’ll respond within one working day.
A planning feasibility report maps the technical and compliance requirements likely to be needed for a planning submission — what evidence is required, what can be phased, and where the highest-risk decisions sit. SustainPlan produces reports that give architects, developers and planning consultants a clear, joined-up picture before they commission individual technical reports.
You need this if you are at pre-application stage and want to understand what the submission will need before committing to a full suite of reports.
You need this if you have received pre-application feedback that references multiple technical requirements and you want a joined-up view of what to commission in what order.
A planning feasibility report assesses the likelihood of obtaining planning consent for a proposed development before significant design or consultant fees are committed. It reviews the site’s planning history, the applicable local and national planning policy framework, any material constraints, and the officer-level reception the proposal is likely to receive.
SustainPlan’s planning feasibility reports are produced alongside or ahead of technical feasibility work — so that the sustainability, energy, and technical reporting requirements are assessed at the same time as the planning prospects. This coordinated approach means clients understand not just whether a scheme is likely to achieve consent, but what technical evidence will be required to support it.
"Used by architects, developers and planning consultants across the UK at pre-application stage — from first-time applicants wanting a route map through to experienced teams wanting a second view before commissioning a full pack."
Planning validation requirements vary significantly between local authorities — and sometimes between case officers within the same authority. We map the likely requirements for your specific authority and scheme type, cross-referencing the adopted local plan, the validation checklist and any pre-application feedback to produce a reliable picture of what the submission will need.
Some technical requirements influence design decisions that are very difficult to change once the scheme progresses — daylight and sunlight constraints affect massing, drainage feasibility affects layout, energy compliance affects the specification. We identify these early-stage decisions and flag them before the design is locked in.
Not all planning evidence needs to be commissioned at the same time. Some reports are needed at application stage; others can be phased to condition discharge. We sequence the evidence requirements so you spend on what is needed now, defer what can wait, and avoid paying twice because reports were commissioned in the wrong order.
Planning packs that fail often do so because reports assume different floor areas, scheme descriptions or design parameters. We recommend a pack structure that starts with shared assumptions and flags where each consultant’s scope depends on inputs from another — so the submission reads as a coordinated set of documents rather than a collection of independent reports.
For schemes that have been refused before, or where the policy context is complex, we analyse the most likely refusal grounds in advance and flag which evidence lines are most important to get right. This is not a guarantee of approval — it is a structured way to reduce the probability of avoidable refusal.
Planning feasibility reports flag where design and compliance modelling — SAP calculations, SBEM calculations, overheating assessments — should be commissioned earlier than teams typically expect. Pulling those outputs forward reduces the risk of a compliant-looking design that fails when properly modelled at a later stage.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For teams who need a fast steer on what the submission is likely to need before going deeper.
Includes: authority validation checklist review, likely requirement summary, key risk flags, verbal or written note.
Best for: very early pre-application stage, schemes where the brief is still forming, teams deciding whether to proceed.
For teams who need a complete, joined-up evidence route-map before commissioning individual technical reports.
Includes: all Option A outputs plus detailed requirement mapping, evidence sequencing plan, pack structure recommendation, input checklist for each technical report, risk register.
Best for: pre-application stage, schemes with multiple technical requirements, teams who have received pre-application feedback and need a joined-up response plan.
For teams whose application has been refused and who need a structured analysis of what went wrong and what needs to change.
Includes: refusal reason analysis, evidence gap identification, revised evidence sequencing plan, recommendations for resubmission pack structure.
Best for: post-refusal stage, appeal preparation, schemes where the reason for refusal is unclear or contested.
Planning feasibility reports are used by architects, developers and planning consultants who want a clear, joined-up picture of what a planning submission will need before they commission individual technical reports. We work with teams across all scheme types and scales — from small residential applications where the requirement is genuinely unclear through to large mixed-use schemes where coordinating multiple consultants from the outset is the most efficient approach.
We do not write or submit planning applications; we map the technical and compliance evidence that the application will need.
The most effective time to commission a planning feasibility report is before the design is fixed and before individual technical consultants have been appointed separately. At this stage, the report can influence which design decisions get made early, how the consultant team is structured, and what evidence gets commissioned in what order.
Commissioning it after the design is locked in — or after individual reports have already been instructed — limits its value, because the decisions that would have been influenced have already been made.
Confirm whether Planning Feasibility Resport is required and what ‘good’ looks like for your local authority and scheme.
Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.
Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.
Produce the report in a format that slots into your submission pack cleanly and defensibly.
Respond to clarifications and help you move from submission to decision/conditions efficiently.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
A planning feasibility report maps the technical and compliance evidence likely to be required for a planning submission — what reports are needed, in what order, and where the highest-risk decisions sit. It gives you a joined-up picture before you spend on a full pack, so you can sequence consultants efficiently and avoid commissioning reports in the wrong order or at the wrong stage.
Cost depends on scheme complexity and how detailed the authority’s requirements are likely to be. A straightforward scheme in a single-tier authority with a clear local plan policy position is quicker to scope than a complex mixed-use scheme in a two-tier authority with emerging policy changes. A short call is the fastest way to confirm scope and cost.
No. A planning feasibility report from SustainPlan is a technical and compliance route-map — it identifies what evidence the submission will need and in what sequence. It does not write or submit the planning application, provide planning policy advice, or substitute for a planning consultant. It works alongside your planning consultant, not instead of one.
Site address, local authority, a description of the proposed scheme and uses, any concept drawings available, pre-application feedback if received, and your target submission date. The more context you can provide about the scheme and the authority’s known concerns, the more specific the feasibility report can be about risk and sequencing.
The feasibility report flags where design and compliance modelling should be commissioned earlier than teams typically expect. SAP and SBEM calculations, overheating assessments and energy modelling are often assumed to be late-stage activities — but their outputs can reveal compliance issues that require design changes. The feasibility report identifies those dependencies and recommends when to pull the modelling forward to avoid late-stage redesign.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk