Overheating Assessment — Protect Comfort and Reduce Late Redesign

Overheating assessment to protect comfort outcomes and support compliance — clear scope for Part O, CIBSE TM59 or TM52, coordinated with your SAP and SBEM inputs.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

SustainPlan delivers overheating assessment UK-wide with a joined-up approach to compliance and comfort.

We clarify scope early — Part O, CIBSE TM59 or TM52 — keep coordination with SAP and SBEM outputs tight, and produce clear results that support design decisions rather than creating last-minute surprises.

You need this if...

Part O or CIBSE TM59/TM52 compliance is required for planning or Building Regulations. 

Your glazing strategy, orientation or massing could create overheating risk during design. 

You need overheating results that are internally consistent with your SAP or SBEM inputs.

Overheating assessment is required for all new residential buildings in England under Part O of the Building Regulations, introduced in 2022. Residential schemes follow the CIBSE TM59 methodology; commercial buildings and mixed-use developments follow CIBSE TM52. Both methodologies assess whether indoor temperatures in summer remain within acceptable limits without mechanical cooling — critical for compliance, warranty sign-off, and the long-term comfort of occupants as UK summers become hotter. Overheating assessment must be coordinated early with the architectural design: glazing ratios, shading strategy, thermal mass, and ventilation openings are all design variables that affect the result. Retrofitting compliance at detailed design stage is significantly more expensive than designing for it at RIBA Stage 2.

What the scope covers?

"Overheating assessment for residential and commercial schemes UK-wide — scoped correctly from the start so compliance is not a late-stage problem."

What you get

What we need from you

Technical deep dive

01

Route Confirmation — Part O vs TM59/TM52

Using the wrong overheating method wastes time and may not satisfy the requirement. We confirm whether Part O, TM59 (residential) or TM52 (non-domestic) applies before modelling starts — so you are not redoing work to a different standard.

02

SAP and SBEM Input Alignment

Overheating analysis shares fabric, glazing and ventilation assumptions with SAP and SBEM. We align inputs from the start so compliance outputs are consistent — a change to glazing in one model is reflected correctly across all.

03

Glazing and Massing Risk Assessment

Overheating risk is primarily driven by solar gain through glazing. We assess risk at design stage so glazing area, g-value, orientation and shading can be optimised before the specification is finalised.

04

Mitigation Options Testing

Where initial results indicate compliance is marginal or failing, we test practical mitigation options — shading, glazing specification, ventilation strategy — and present clear trade-offs so the design team can make an informed decision.

05

Cross-Ventilation and Adaptive Comfort

For naturally ventilated residential schemes, the cross-ventilation pathway affects both Part O and TM59 outcomes. We flag where layout and opening configurations create risk and where adaptive comfort criteria may offer a more realistic compliance route.

06

Planning and Building Regulations Evidence

Where overheating assessment is required for planning or Building Regulations sign-off, we produce outputs in the format required by the relevant authority or building control body — not a generic report that generates follow-up queries.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Part O Compliance Check

For: For residential projects where Part O Building Regulations compliance is required.

You receive: Part O overheating check with pass/fail result and mitigation options where required.

Option B - Most Common

CIBSE TM59 or TM52 Assessment

For: For projects requiring detailed dynamic thermal modelling — residential TM59 or non-domestic TM52.

You receive: Full dynamic thermal model — pass/fail per methodology, mitigation tested, assumptions aligned with SAP or SBEM.

Option C

Planning with Design Coordination

For: For schemes where overheating assessment is required for planning and the result needs to influence the glazing and massing strategy.

You receive: Assessment with iterative design risk review — glazing options tested, results planning-ready.

Not sure which overheating standard applies to your scheme?

Who it's for and when to use it

Who it’s for:

SustainPlan provides overheating assessments for architects, developers and building physics consultants on residential and commercial schemes.

Most commonly needed where Part O compliance, CIBSE TM59 assessment or planning conditions require overheating evidence — particularly on south-facing glazed schemes.

Best timing:

Commission at RIBA Stage 3, once glazing strategy and orientation are defined but before specification is fixed. Earlier engagement allows glazing and shading options to be tested at a stage when changes are still low-cost.

Leaving overheating analysis to detailed design increases the risk of expensive mitigation.

Our process

1

Scope call

Confirm correct route (Part O, TM59 or TM52), stage, glazing strategy and any planning requirements.

2

Inputs and alignment

Collect drawings, glazing spec, ventilation intent and align with SAP/SBEM assumptions.

3

Modelling

Run dynamic thermal analysis using aligned inputs and produce first-pass results.

4

Design risk review

Present results, test mitigation options where needed, and confirm compliance route.

5

Final report

Issue compliant output in the required format with supporting notes for the design team.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 2 of 4 — Design & Compliance

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.