New Build Residential EPC — SAP-Aligned, Ready Before Sign-Off

UK-wide new build residential EPCs aligned to your completion programme — clear evidence, coordinated with SAP and airtightness testing, no last-minute delays.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.
SustainPlan provides UK-wide new build EPCs for residential projects at completion. We align inputs with SAP calculations and programme timing — so you have submission-ready evidence without last-minute scramble, and Building Control sign-off is not held up by missing compliance documentation.

You need this if...

Building Regulations require a new build EPC before residential sign-off. SAP as-built calculations are complete and the EPC needs to follow on the same timeline. You need EPC and SAP inputs to be consistent so there are no queries at completion.
An energy performance certificate for a new residential building is produced from the as-built SAP calculations at practical completion and is required before the dwelling can be occupied. For housebuilders and developers, the energy performance certificate is the final output of the SAP calculations process — confirming that the dwelling as built achieves the design stage compliance and that the SAP rating is accurate for the actual specification. SustainPlan manages the transition from design stage SAP calculations through to as-built sign-off — coordinating the airtightness test result, confirmed U-values, and any specification changes that occurred during construction, so the as-built SAP calculations and energy performance certificate accurately reflect the completed dwelling.

What the scope covers?

"New build residential EPCs for housing developers, contractors and architects across the UK — SAP-aligned, airtightness coordinated and ready for sign-off on programme."

What you get

What we need from you

Technical deep dive

01

SAP and EPC Input Alignment

New build residential EPCs are produced directly from as-built SAP calculation outputs. We align inputs between both so there are no discrepancies — a mismatch between SAP and EPC is one of the most common causes of avoidable Building Control delays.

02

Airtightness Test Coordination

The airtightness test result updates the as-built SAP and feeds into the EPC. We coordinate the handover of test results so both compliance outputs are updated at the same time and sign-off is not held waiting for one piece of evidence.

03

Completion Programme Planning

Building Regulations sign-off requires the EPC to be in place before inspection. We confirm lead time at the start of the project so EPC production is on the programme, not a surprise addition at completion.

04

Multi-Plot Coordination

For residential developments with multiple plots, EPCs need to be produced as each plot completes. We schedule production to match the handover programme — so each plot's compliance evidence is ready when Building Control inspects.

05

Home Energy Rating for Marketing

New build residential EPCs include an energy efficiency rating that can be used in property marketing. We ensure the rating reflects actual as-built performance rather than design assumptions that may differ from what was constructed.

06

Predicted Energy Assessment Continuity

The new build EPC should match the Predicted Energy Assessment (PEA) produced at design stage, adjusted for actual construction. Where design-stage SAP was produced separately, we align as-built outputs for consistency.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Single Plot EPC

For: For single dwellings or small schemes needing an EPC at completion.

You receive: New build residential EPC lodged with SAP input alignment and Building Control evidence.

Option B - Most Common

Multi-Plot Development

For: For residential developments with multiple plots needing EPCs coordinated with the phased handover programme.

You receive: Multi-plot EPC programme — scheduled to match handover, SAP aligned, airtightness coordinated.

Option C

EPC and SAP as-built Package

For: For projects where SAP as-built and new build EPC are both needed and should be produced from the same inputs.

You receive: Coordinated SAP as-built and EPC package — aligned assumptions, one point of contact.

Want to make sure your EPC is ready before sign-off?

Who it's for and when to use it

Who it’s for:

SustainPlan provides new build residential EPCs for housing developers, architects and contractors on schemes approaching completion.

Most commonly commissioned alongside SAP as-built calculations, coordinated with the airtightness test programme and Building Regulations completion.

Best timing:

Confirm handover dates, plot schedule, airtightness test timing and Building Control requirements.

Our process

1

Programme confirmation

Confirm completion date, airtightness test timing and Building Control requirements.

2

SAP alignment

Collect as-built SAP outputs and confirm EPC scope.

3

Airtightness coordination

Incorporate test result and update SAP and EPC inputs.

4

EPC production and lodging

Produce and lodge new build EPC on national register.

5

Compliance handover

Issue Building Control evidence and confirm plot completion schedule.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.