UK-wide new build residential EPCs aligned to your completion programme — clear evidence, coordinated with SAP and airtightness testing, no last-minute delays.
Tell us about your project and we’ll respond within one working day.
"New build residential EPCs for housing developers, contractors and architects across the UK — SAP-aligned, airtightness coordinated and ready for sign-off on programme."
New build residential EPCs are produced directly from as-built SAP calculation outputs. We align inputs between both so there are no discrepancies — a mismatch between SAP and EPC is one of the most common causes of avoidable Building Control delays.
The airtightness test result updates the as-built SAP and feeds into the EPC. We coordinate the handover of test results so both compliance outputs are updated at the same time and sign-off is not held waiting for one piece of evidence.
Building Regulations sign-off requires the EPC to be in place before inspection. We confirm lead time at the start of the project so EPC production is on the programme, not a surprise addition at completion.
For residential developments with multiple plots, EPCs need to be produced as each plot completes. We schedule production to match the handover programme — so each plot's compliance evidence is ready when Building Control inspects.
New build residential EPCs include an energy efficiency rating that can be used in property marketing. We ensure the rating reflects actual as-built performance rather than design assumptions that may differ from what was constructed.
The new build EPC should match the Predicted Energy Assessment (PEA) produced at design stage, adjusted for actual construction. Where design-stage SAP was produced separately, we align as-built outputs for consistency.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For: For single dwellings or small schemes needing an EPC at completion.
You receive: New build residential EPC lodged with SAP input alignment and Building Control evidence.
For: For residential developments with multiple plots needing EPCs coordinated with the phased handover programme.
You receive: Multi-plot EPC programme — scheduled to match handover, SAP aligned, airtightness coordinated.
For: For projects where SAP as-built and new build EPC are both needed and should be produced from the same inputs.
You receive: Coordinated SAP as-built and EPC package — aligned assumptions, one point of contact.
SustainPlan provides new build residential EPCs for housing developers, architects and contractors on schemes approaching completion.
Most commonly commissioned alongside SAP as-built calculations, coordinated with the airtightness test programme and Building Regulations completion.
Confirm handover dates, plot schedule, airtightness test timing and Building Control requirements.
Confirm completion date, airtightness test timing and Building Control requirements.
Collect as-built SAP outputs and confirm EPC scope.
Incorporate test result and update SAP and EPC inputs.
Produce and lodge new build EPC on national register.
Issue Building Control evidence and confirm plot completion schedule.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
An Energy Performance Certificate (EPC) provides an energy efficiency rating for a building. Requirements depend on building type and purpose (sale/letting, completion, or compliance). Start a conversation and we’ll confirm the correct route.
A new build EPC is aligned to the design/compliance pathway at completion, while an existing building EPC relates to an already-built asset. See this page. If you want to reduce risk, treat new build commercial EPC as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Often, yes—particularly at completion. The exact requirement depends on the project type and the compliance pathway. We’ll confirm scope early to avoid last-minute surprises. If you want to reduce risk, treat new build commercial EPC as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth
Yes—improvements depend on fabric, systems and controls. For structured upgrades, pair with a retrofit feasibility report or a portfolio decarbonisation strategy.
Timing depends on inputs and access. If you’re on a programme, share dates early and we’ll plan delivery to meet deadlines. If you want to reduce risk, treat new build commercial EPC as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk