UK-wide new build commercial EPCs that align with SBEM calculations and your completion programme — so Building Control sign-off is not delayed by missing compliance evidence.
Tell us about your project and we’ll respond within one working day.
SustainPlan delivers UK-wide new build EPCs for commercial buildings at completion.
We align EPC inputs with SBEM calculations and coordinate timing with your sign-off programme — so you have submission-ready compliance evidence without last-minute scramble before handover.
An energy performance certificate for a new commercial building is issued at completion and is a legal requirement before occupation. For new builds, the energy performance certificate is produced from the as-built SBEM calculations submitted to building control — confirming that the building as constructed meets or exceeds the design stage compliance target.
The energy performance certificate rating is determined by the building’s asset rating, not its operational performance, and reflects the fabric, services, and fixed building systems as installed. SustainPlan manages the as-built SBEM calculations update, coordinates the energy performance certificate production, and ensures that any variations between the design stage specification and the as-built condition are captured accurately before the certificate is lodged.
"New build commercial EPCs for offices, retail, industrial and mixed-use projects across the UK — aligned with SBEM and completion programmes, no last-minute surprises."
New build commercial EPCs are produced from the same inputs as the as-built SBEM calculation. We align both so assumptions are consistent — a mismatch between SBEM and EPC is a common source of avoidable Building Control queries.
The measured airtightness value from the on-site test updates the as-built SBEM and informs the EPC. We coordinate handover of the test result so both compliance outputs are updated consistently without delay.
New build EPCs are needed before Building Control sign-off, which is often tied to a hard handover date. We confirm our lead time at the start so EPC production is on the critical path, not a last-minute addition.
For shell and core commercial buildings, the EPC scope depends on what is in the base build and what is excluded as tenant fit-out. We confirm the correct scope boundary before assessment to avoid producing an EPC that does not match the Building Control submission.
Where BREEAM certification is also being pursued, energy credit calculations and EPC ratings must be consistent. We flag where EPC inputs feed into BREEAM evidence and ensure the same building specification is reflected across both.
For commercial buildings that will be let, the new build EPC rating determines the starting compliance position for future MEES obligations. We flag the implications for the landlord's letting strategy at the point of issue.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For: For commercial projects where an EPC is needed at completion and SBEM is being handled by a separate consultant.
You receive: New build EPC lodged with SBEM input coordination and Building Control compliance evidence.
For: For projects where SBEM and EPC are both required and need to be produced from aligned inputs.
You receive: Coordinated SBEM and EPC package — aligned assumptions, airtightness coordination and completion sign-off.
For: For commercial developments where fit-out boundary needs to be confirmed before EPC scope is defined.
You receive: Scope confirmation note plus EPC covering the defined base build scope.
SustainPlan provides new build commercial EPCs for architects, developers, contractors and project managers on commercial schemes approaching completion.
Most commonly commissioned alongside or after SBEM calculations, coordinated with the airtightness test and Building Control sign-off timeline.
Commission before practical completion — ideally when SBEM as-built calculations are in progress and the airtightness test is scheduled.
Late commissioning creates programme risk if the EPC cannot be lodged before the Building Control inspection.
Confirm completion date, airtightness test timing and Building Control requirements.
Collect as-built SBEM outputs and confirm EPC scope boundary.
Incorporate test result once available and update compliance outputs.
Produce and lodge new build EPC on national register.
Issue Building Control compliance evidence and flag MEES implications.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
An Energy Performance Certificate (EPC) provides an energy efficiency rating for a building. Requirements depend on building type and purpose (sale/letting, completion, or compliance). Start a conversation and we’ll confirm the correct route.
A new build EPC is aligned to the design/compliance pathway at completion, while an existing building EPC relates to an already-built asset. See this page. If you want to reduce risk, treat new build commercial EPC as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
Often, yes—particularly at completion. The exact requirement depends on the project type and the compliance pathway. We’ll confirm scope early to avoid last-minute surprises. If you want to reduce risk, treat new build commercial EPC as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth
Yes—improvements depend on fabric, systems and controls. For structured upgrades, pair with a retrofit feasibility report or a portfolio decarbonisation strategy.
Timing depends on inputs and access. If you’re on a programme, share dates early and we’ll plan delivery to meet deadlines. If you want to reduce risk, treat new build commercial EPC as part of a joined-up package rather than a last-minute checkbox. We can step in at any stage and coordinate evidence so sign-off is smooth.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details. |
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk