New Build Commercial EPC — Aligned with SBEM, Ready for Sign-Off

UK-wide new build commercial EPCs that align with SBEM calculations and your completion programme — so Building Control sign-off is not delayed by missing compliance evidence.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

SustainPlan delivers UK-wide new build EPCs for commercial buildings at completion.

We align EPC inputs with SBEM calculations and coordinate timing with your sign-off programme — so you have submission-ready compliance evidence without last-minute scramble before handover.

You need this if...

Building Control sign-off requires a new build EPC for a commercial project. SBEM calculations are complete and the EPC needs to follow before practical completion. You want EPC and SBEM inputs to be consistent so there are no compliance queries at sign-off.

An energy performance certificate for a new commercial building is issued at completion and is a legal requirement before occupation. For new builds, the energy performance certificate is produced from the as-built SBEM calculations submitted to building control — confirming that the building as constructed meets or exceeds the design stage compliance target. 

The energy performance certificate rating is determined by the building’s asset rating, not its operational performance, and reflects the fabric, services, and fixed building systems as installed. SustainPlan manages the as-built SBEM calculations update, coordinates the energy performance certificate production, and ensures that any variations between the design stage specification and the as-built condition are captured accurately before the certificate is lodged.

What the scope covers?

"New build commercial EPCs for offices, retail, industrial and mixed-use projects across the UK — aligned with SBEM and completion programmes, no last-minute surprises."

What you get

What we need from you

Technical deep dive

01

SBEM and EPC Input Alignment

New build commercial EPCs are produced from the same inputs as the as-built SBEM calculation. We align both so assumptions are consistent — a mismatch between SBEM and EPC is a common source of avoidable Building Control queries.

02

Airtightness Test Coordination

The measured airtightness value from the on-site test updates the as-built SBEM and informs the EPC. We coordinate handover of the test result so both compliance outputs are updated consistently without delay.

03

Completion Programme Alignment

New build EPCs are needed before Building Control sign-off, which is often tied to a hard handover date. We confirm our lead time at the start so EPC production is on the critical path, not a last-minute addition.

04

Shell and Core vs Fitted Out

For shell and core commercial buildings, the EPC scope depends on what is in the base build and what is excluded as tenant fit-out. We confirm the correct scope boundary before assessment to avoid producing an EPC that does not match the Building Control submission.

05

BREEAM and Compliance Coordination

Where BREEAM certification is also being pursued, energy credit calculations and EPC ratings must be consistent. We flag where EPC inputs feed into BREEAM evidence and ensure the same building specification is reflected across both.

06

Landlord and Tenant Obligations

For commercial buildings that will be let, the new build EPC rating determines the starting compliance position for future MEES obligations. We flag the implications for the landlord's letting strategy at the point of issue.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Completion EPC Only

For: For commercial projects where an EPC is needed at completion and SBEM is being handled by a separate consultant.

You receive: New build EPC lodged with SBEM input coordination and Building Control compliance evidence.

Option B - Most Common

EPC with SBEM Coordination

For: For projects where SBEM and EPC are both required and need to be produced from aligned inputs.

You receive: Coordinated SBEM and EPC package — aligned assumptions, airtightness coordination and completion sign-off.

Option C

Shell and Core Scoping

For: For commercial developments where fit-out boundary needs to be confirmed before EPC scope is defined.

You receive: Scope confirmation note plus EPC covering the defined base build scope.

Want to make sure your EPC is ready before practical completion?

Who it's for and when to use it

Who it’s for:

SustainPlan provides new build commercial EPCs for architects, developers, contractors and project managers on commercial schemes approaching completion.

Most commonly commissioned alongside or after SBEM calculations, coordinated with the airtightness test and Building Control sign-off timeline.

Best timing:

Commission before practical completion — ideally when SBEM as-built calculations are in progress and the airtightness test is scheduled.

Late commissioning creates programme risk if the EPC cannot be lodged before the Building Control inspection.

Our process

1

Programme confirmation

Confirm completion date, airtightness test timing and Building Control requirements.

2

SBEM input alignment

Collect as-built SBEM outputs and confirm EPC scope boundary.

3

Airtightness coordination

Incorporate test result once available and update compliance outputs.

4

EPC production and lodging

Produce and lodge new build EPC on national register.

5

Compliance handover

Issue Building Control compliance evidence and flag MEES implications.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.