Mechanical design built for performance and practical completion

HVAC, ventilation and heat-recovery strategies sized to realistic loads and aligned with energy modelling — so the design performs as intended from handover.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

Mechanical design covers HVAC, ventilation, heat recovery, domestic hot water and associated pipework and controls — coordinated with energy compliance and overheating requirements.

SustainPlan delivers mechanical design that aligns system assumptions with SBEM, SAP and TM54 modelling, coordinates interfaces with the electrical and structural packages, and produces specification-ready outputs.

You need this if mechanical system selection is unconfirmed and procurement is approaching — or if the current design is based on assumptions that conflict with the energy modelling or overheating assessment. 

You need this if the project requires airtightness and ventilation testing at handover and you want the mechanical design to be structured so it passes first time.

Mechanical design for buildings covers heating systems, hot and cold water services, drainage, compressed air, medical gases, and the integration of heat pumps, heat recovery systems, and district heat network connections. It must be coordinated from RIBA Stage 2 with the structural engineer, the architect, and the electrical designer to resolve plant room sizing, pipe routes, riser allocations, and interface with the building envelope. Mechanical design decisions — particularly heating system type, hot water strategy, and ventilation approach — are the primary drivers of SAP calculations and SBEM calculations compliance outcomes. SustainPlan produces mechanical design as part of an integrated MEP service, coordinated with the energy model throughout detailed design to ensure that compliance is achieved in the as-built condition, not just on paper at design stage.

What the scope covers?

"Used by architects, developers and project teams across the UK on planning submissions from initial feasibility through to discharge of conditions."

What you get

What we need from you

Technical deep dive

01

HVAC load assessment and system selection

We size HVAC systems based on realistic occupancy profiles, internal gains and fabric performance — not conservative defaults that produce oversized plant and poor part-load efficiency. System selection is evaluated against the project’s specific constraints: plantroom area, ceiling void depth, occupancy flexibility and energy performance targets.

02

Ventilation design and indoor air quality

Ventilation rates, filtration specification, heat recovery selection and control strategy determine indoor air quality and energy performance in equal measure. We design ventilation systems that can be verified at commissioning against the specified rates and that will pass ventilation testing at handover without requiring last-minute adjustments.

03

Domestic hot water: system design and Legionella control

DHW system design decisions — system type, storage volume, distribution temperature, point-of-use versus central strategy — affect energy compliance, Legionella risk and maintenance cost. We document the design assumptions and control strategy so the installer and operator have the information needed to commission and manage the system safely.

04

Pipework and ductwork strategy and MEP coordination

Pipework and ductwork routes determine ceiling void usage, structural penetrations and BIM coordination effort. We define the distribution strategy early — primary routes, riser locations, branch sizing approach — so that the MEP coordination effort is focused on resolving real conflicts rather than working around an uncoordinated layout.

05

Alignment with energy compliance modelling

Mechanical design assumptions — system type, heat recovery efficiency, control strategy, operating schedules — are direct inputs to SBEM, SAP and TM54 modelling. If the installed system differs from the modelled assumptions, compliance may be at risk and in-use performance will not match predictions. We align design and modelling from the outset to prevent this gap.

06

Commissioning, airtightness and ventilation testing readiness

Mechanical systems that are difficult to commission create practical completion delays and failed handover tests. We design with testing in mind: accessible measurement points, balanced flow circuits, clear setpoint documentation, and a commissioning strategy that aligns with the airtightness and ventilation testing requirements.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Early-stage strategy

For teams who need mechanical strategy, system selection and ventilation approach confirmed before detailed design and procurement progresses.

Includes: mechanical system selection, load assessment, ventilation strategy, DHW approach, key interface notes for MEP coordination.

Best for: RIBA Stage 2, schemes at early design stage, projects where mechanical system type or ventilation strategy is unconfirmed.

Option B - Most Common

Design development

For teams who are in active design development and need coordinated mechanical design aligned with evolving architectural and MEP drawings.

Includes: all Option A outputs plus detailed mechanical design, duct and pipework sizing, plant schedule, ventilation design, specification-ready package, energy modelling alignment.

Best for: RIBA Stage 3–4, schemes in procurement, projects where the mechanical package needs to be specification-ready and coordinated.

Option C

Pre-handover readiness

For teams who are approaching handover and need commissioning support, airtightness and ventilation testing coordination, and sign-off documentation.

Includes: commissioning readiness review, airtightness and ventilation testing coordination, setpoint confirmation, O&M documentation review.

Best for: pre-handover stage, schemes approaching practical completion, projects with outstanding mechanical commissioning or handover testing requirements.

Not sure which option fits your stage?

Who it's for and when to use it

Who it’s for:

Mechanical design is used by architects, developers and M&E contractors who need HVAC, ventilation and DHW systems designed, coordinated and specified as part of the wider building services package. We work with teams across residential, commercial and mixed-use projects where mechanical performance is material to energy compliance, indoor air quality and overheating risk.

The scope is structured around the project’s actual mechanical requirements and programme constraints — not a generic service applied without regard for the specific building type.

Best timing:

The most effective time to commission mechanical design is at RIBA Stage 2, when system selection, load assessment and ventilation strategy can still influence plantroom sizing, ceiling void allocation and facade strategy.

Decisions made at this stage have cost implications that compound as the project develops — particularly where airtightness and ventilation testing requirements need to be designed-in from the start.

Our process

1

Quick triage call

Confirm whether Mechanical Design is required and what ‘good’ looks like for your local authority and scheme.

2

Inputs + assumptions lock

Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.

3

Analysis + iterations

Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.

4

Planning-ready output

Produce the report in a format that slots into your submission pack cleanly and defensibly.

5

Support through queries

Respond to clarifications and help you move from submission to decision/conditions efficiently.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.

FAQs

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 3 of 4 — MEP Design & Integration

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.