Lighting design that balances visual comfort and energy compliance

Task lighting, glare control and controls strategy — coordinated with electrical design and SBEM modelling so the performance target is achievable.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

Lighting design for buildings defines illuminance levels, glare control, luminaire selection and controls strategy for each space.

SustainPlan delivers lighting design coordinated with the electrical package and energy modelling assumptions, producing specification-ready outputs that survive value engineering without losing compliance or visual comfort performance.

You need this if lighting power density and controls strategy need to be confirmed before SBEM or TM54 modelling is finalised — or if the energy model assumes a controls scheme that hasn’t been specified. 

You need this if a fit-out project has tight ceiling coordination constraints and lighting needs to be resolved alongside diffusers, sprinklers and other services before detailed drawings are issued.

Lighting design for buildings balances visual comfort, energy efficiency, and the technical requirements of the space — addressing illuminance levels, glare control, colour rendering, emergency lighting, and controls integration. Lighting is typically one of the larger contributors to regulated energy consumption in non-domestic buildings and has a significant effect on the SBEM calculations outcome and BREEAM energy category performance. SustainPlan produces lighting design coordinated with the electrical design, the SBEM calculations compliance strategy, and any BREEAM credits for lighting quality and controls. Daylighting analysis is integrated with the architectural design so that artificial lighting loads are minimised, and occupancy-based controls are specified in a way that is practical to install, commission, and use.

What the scope covers?

"Used by architects, developers and project teams across the UK on planning submissions from initial feasibility through to discharge of conditions."

What you get

What we need from you

Technical deep dive

01

Illuminance targets and task lighting requirements

Lighting design starts with understanding how each space will be used: the tasks performed, the occupancy pattern and the visual demands on users. We define illuminance targets by space type in accordance with CIBSE guidance and the client brief, producing a lighting strategy that meets user needs rather than a single standard applied uniformly across the building.

02

Glare control and visual comfort

Glare is the most common cause of occupant dissatisfaction with lighting in commercial buildings. We define UGR (Unified Glare Rating) limits for each space and select luminaire types and positions that achieve them, coordinated with the ceiling grid, window positions and reflectance assumptions of the interior design.

03

Lighting controls and energy compliance

Lighting power density and controls strategy are primary drivers of SBEM and TM54 energy model outcomes. We design the controls scheme — DALI addressing, PIR occupancy detection, daylight-linked dimming, time scheduling — so that the installed system matches the energy model assumptions and the compliance position is maintained after value engineering.

04

Emergency lighting and life safety coordination

Emergency lighting design must be coordinated with the escape route layout, detection system philosophy and fire strategy. We define the emergency lighting scheme in alignment with BS 5266 and the fire strategy requirements so that life safety compliance is built into the lighting design rather than added as a separate exercise after the layout is fixed.

05

Ceiling coordination in fit-out projects

In commercial and hospitality fit-out, lighting is one of the most coordination-intensive services: it must be positioned to avoid ceiling diffusers, sprinkler heads, smoke detectors and structural grid constraints while meeting the design intent. We map these coordination rules early and produce lighting layouts that are buildable within the ceiling zone constraints.

06

Specification for procurement and value engineering

Lighting specifications frequently change during procurement. We structure the specification around performance requirements — luminous efficacy, colour rendering, controls compatibility, IP rating — rather than a single product, so the procurement team has the information needed to evaluate substitutions without inadvertently breaking the energy modelling assumptions or glare control performance.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Early-stage strategy

For teams who need lighting strategy and energy compliance inputs confirmed before detailed design and SBEM modelling progresses.

Includes: lighting strategy by space type, illuminance targets, controls philosophy, lighting power density inputs for energy modelling.

Best for: RIBA Stage 2, schemes where SBEM modelling is in progress, projects where lighting controls strategy is unconfirmed.

Option B - Most Common

Design development

For teams who are in active design development and need detailed lighting design coordinated with the ceiling layout, electrical package and energy model.

 

Includes: all Option A outputs plus detailed lighting layout, glare control analysis, emergency lighting design, controls specification, procurement-ready package.

Best for: RIBA Stage 3–4, fit-out projects, schemes where the lighting package needs to be specification-ready and coordinated with the electrical and ceiling design.

Option C

Pre-handover readiness

For teams who are approaching handover and need lighting commissioning support, scene setting documentation and post-occupancy performance verification.

Includes: commissioning readiness review, scene setting documentation, emergency lighting test protocol, post-occupancy illuminance verification.

Best for: pre-handover stage, projects with outstanding lighting commissioning requirements, schemes requiring post-occupancy performance evidence for BREEAM or EPC purposes.

Not sure which option fits your stage?

Who it's for and when to use it

Who it’s for:

Lighting design is used by architects, interior designers, developers and fit-out project managers who need lighting designed and specified as part of the wider services package.

We work with teams on commercial, hospitality, residential and mixed-use projects where the lighting design needs to be coordinated with the electrical package, the energy model and the ceiling coordination constraints — not produced in isolation after the services layout is fixed.

Best timing:

The most effective time to commission lighting design is at RIBA Stage 2 to early Stage 3, when controls strategy and lighting power density can be confirmed before the SBEM model is finalised and before the ceiling layout is fixed.

Lighting decisions made at this stage have both energy compliance implications and ceiling coordination implications that compound as the project progresses.

Our process

1

Quick triage call

Confirm whether Lightning Design is required and what ‘good’ looks like for your local authority and scheme.

2

Inputs + assumptions lock

Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.

3

Analysis + iterations

Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.

4

Planning-ready output

Produce the report in a format that slots into your submission pack cleanly and defensibly.

5

Support through queries

Respond to clarifications and help you move from submission to decision/conditions efficiently.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.

FAQs

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 3 of 4 — MEP Design & Integration

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.