Loads sized to realistic use, systems selected for operability, and assumptions aligned with energy modelling so performance targets are achievable.
Tell us about your project and we’ll respond within one working day.
HVAC design covers heating, cooling, ventilation and controls — sized to realistic occupancy loads and coordinated with energy compliance and overheating requirements.
SustainPlan delivers HVAC design that aligns system selection with SBEM and TM54 modelling assumptions, coordinates with the wider MEP team, and produces buildable, specification-ready outputs.
You need this if HVAC system selection has not yet been confirmed and procurement is approaching — or if the current design is based on assumptions that haven’t been checked against comfort and energy performance targets.
You need this if the project has overheating risk — and you want HVAC strategy to address it through design rather than paying for late mitigation measures.
HVAC design — heating, ventilation, and air conditioning design — determines how a building is heated, cooled, and ventilated in response to occupancy and climate. It is one of the most significant factors in whole-building energy performance, occupant comfort, and operational carbon emissions. HVAC design must be coordinated early with the architectural concept: plant room sizing, riser routes, ceiling void depths, and facade strategy all depend on the HVAC system type selected. SustainPlan develops HVAC design integrated with the overheating assessment, SBEM calculations compliance strategy, and TM54 operational energy assessment — ensuring that the mechanical strategy delivers the energy performance the project needs rather than being optimised in isolation from the energy model.
"Used by architects, developers and project teams across the UK on planning submissions from initial feasibility through to discharge of conditions."
Oversizing plant produces higher capital cost, poorer part-load efficiency and comfort problems when systems hunt between heating and cooling. We size loads based on realistic occupancy profiles, internal gain assumptions and fabric performance — not conservative defaults that guarantee oversizing.
HVAC system selection determines energy performance, maintenance requirements and occupant comfort for the life of the building. We evaluate options against the project’s specific constraints — plantroom area, ceiling void depth, occupancy flexibility, landlord requirements — and recommend a zoning strategy that delivers comfort without unnecessary complexity.
A well-designed HVAC system operated badly is an expensive source of complaints. We define the controls philosophy — setpoints, sensors, demand control ventilation, simultaneous heating and cooling prevention — so that the system performs as designed when occupied and does not generate energy waste when empty.
Overheating assessment requirements are shaping HVAC design choices on residential and commercial projects. We integrate passive overheating risk reduction — night purging, openable window strategy, glazing assumptions, shading — into the HVAC design so the assessment can be passed without installing active cooling that adds cost and energy use.
HVAC system type, control assumptions and operating schedules are inputs to energy compliance models. If the installed HVAC system differs from the modelled assumptions, the project may not perform as predicted and compliance may be at risk. We coordinate HVAC design with modelling inputs from the outset so the specification and the model are consistent.
HVAC systems that are difficult to commission create practical completion delays. We design with commissioning in mind: clear setpoints, accessible measurement points, balanced flow routes and test documentation structure that makes it straightforward to demonstrate performance against the design intent during handover.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For teams who need HVAC strategy and system selection confirmed before detailed design and procurement progresses.
Includes: load assessment, system selection options, zoning strategy, controls philosophy, key interface notes for MEP coordination.
Best for: RIBA Stage 2, schemes at early design stage, projects where HVAC strategy or system type is unconfirmed.
For teams who are in active design development and need HVAC design coordinated with evolving architectural and MEP drawings.
Includes: all Option A outputs plus detailed HVAC design, duct and pipework sizing strategy, plant schedule, specification-ready package, energy modelling alignment.
Best for: RIBA Stage 3–4, schemes in procurement, projects where the HVAC package needs to be specification-ready and coordinated.
For teams who are approaching handover and need HVAC commissioning support, sign-off documentation and performance verification.
Includes: commissioning readiness review, setpoint confirmation, test documentation structure, handover performance check.
Best for: pre-handover stage, schemes approaching practical completion, projects with outstanding HVAC commissioning or certification requirements.
HVAC design is used by architects, developers, M&E contractors and project managers who need heating, cooling and ventilation systems designed, sized and specified as part of the wider MEP package. We work with teams across residential, commercial and mixed-use projects where HVAC performance is material to energy compliance, occupant comfort or overheating risk.
The scope is always structured around the project’s actual comfort requirements and energy performance targets — not a generic specification that ignores the constraints of the specific building type and use.
The most effective time to commission HVAC design is at RIBA Stage 2, when system selection and load assessment can still influence plantroom sizing, ceiling void depth and facade strategy. HVAC decisions made early have cost implications that compound as the project develops.
Waiting until Stage 3 means HVAC design is constrained by space allocations and structural decisions that are already fixed.
Confirm whether HVAC Design is required and what ‘good’ looks like for your local authority and scheme.
Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.
Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.
Produce the report in a format that slots into your submission pack cleanly and defensibly.
Respond to clarifications and help you move from submission to decision/conditions efficiently.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.
Cost depends on building size, system complexity and the scope of coordination required with energy modelling and other MEP disciplines. A straightforward commercial scheme with a single HVAC system type is simpler than a mixed-use development with multiple zones, different occupancy profiles and overheating assessment obligations. A scoping call is the fastest way to confirm scope and get a reliable cost.
Starting at RIBA Stage 2 is most effective because HVAC system selection and load assessment influence plantroom size, ceiling void depth and facade strategy — all of which are expensive to change later. Starting at Stage 3 is possible but constrains the options available. Waiting until Stage 4 often means the HVAC design is working around decisions that have already locked in the spatial and structural constraints.
SBEM and TM54 models use specific inputs for system type, operating schedules, setpoints and zoning. If the installed HVAC system differs from those inputs, the modelled performance will not match the as-built building. We align HVAC design with modelling inputs from the outset so that the specification and the energy model are consistent.
Latest drawings or model, floor plans and room data sheets, performance targets (comfort criteria, energy benchmarks), plantroom area and ceiling void constraints, known procurement route, and any modelling outputs already produced. If an overheating assessment has been commissioned, sharing it early allows us to align the HVAC strategy with the passive measures and system assumptions used in the assessment.
Value engineering on HVAC packages commonly involves system substitutions, zone consolidation or reduction in heat recovery specification. The risk is that substitutions break the energy modelling assumptions or overheating assessment. We assess each change against the original HVAC design intent and flag where revisions require the energy model or overheating assessment to be updated before practical completion.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk