Fire strategy reports that stay aligned to your design

Coordinated with MEP, architecture and structure — so fire compliance is built into the design, not retrofitted after a late review.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

A fire strategy report sets out how a building achieves compliance with fire safety requirements — covering means of escape, compartmentation, smoke control, detection and suppression. 

SustainPlan produces fire strategy reports coordinated with the architectural and MEP design so that fire requirements are resolved during design rather than discovered at inspection.

You need this if your building regulations application or planning consent requires a fire strategy, and you want it coordinated with the MEP design from the start rather than issued as a standalone document.  

You need this if service penetrations, smoke control or plantroom layouts have not yet been reviewed against fire compartmentation requirements — and procurement is approaching.

A fire strategy report sets out the fundamental approach to fire safety for a building — addressing means of escape, fire detection and alarm, suppression systems, compartmentation, structural fire resistance, and access for fire service vehicles and personnel. It is prepared at RIBA Stage 2 or 3 for submission with a planning application or building regulations application, and provides the framework against which the detailed design will be assessed by building control. 

For higher-risk buildings under the Building Safety Act, the fire strategy report forms part of the gateway process and requires sign-off from the Building Safety Regulator. SustainPlan prepares fire strategy reports coordinated with the architectural and structural design — ensuring that fire safety requirements are integrated into the building design from the outset.

What the scope covers?

"Used by architects, developers and project teams across the UK on planning submissions from initial feasibility through to discharge of conditions."

What you get

What we need from you

Technical deep dive

01

Means of escape and travel distance compliance

Travel distances, exit widths and refuge provision are determined by building use, occupancy and compartment layout. We review these against the relevant Approved Document B requirements early in the design so that layout changes required for compliance are made while the floor plan is still flexible, not after detailed drawings are complete.

02

Compartmentation and service penetrations

Compartmentation is where fire strategy most directly affects MEP design. Every duct, pipe and cable that passes through a fire-rated wall or floor requires a protected penetration. We map the penetration schedule against the MEP route strategy early so that the coordination is resolved before the contractor encounters it on site.

03

Smoke control strategy and system selection

Smoke control can be achieved through natural ventilation, mechanical extract, pressurisation or a combination. The choice depends on building type, height, occupancy and the local authority’s and approved inspector’s expectations. We define the strategy at an early stage so the MEP team can design the system rather than retrofitting it around an already-fixed layout.

04

Detection, suppression and life safety system coordination

Sprinkler strategy, detection zoning and alarm philosophy need to be defined in the fire strategy and reflected in the electrical and MEP design. We document these requirements in a form that the specialist subcontractors can price and install from, with clear interface points for the electrical and controls packages.

05

Approved inspector and building control coordination

Fire strategies are reviewed by the approved inspector or building control body as part of the building regulations process. We structure the document to meet their expectations and support the review process, reducing the number of revision cycles and the risk of late conditions that affect the programme.

06

Managing fire strategy through design change

Design changes — revised layouts, altered escape routes, changed occupancy assumptions — can invalidate a fire strategy that was produced at an earlier stage. We track the key fire strategy parameters throughout the design development and flag when a change requires the strategy to be updated so that the building regulations submission remains current.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Early-stage strategy

For teams who need the fire strategy established before detailed design progresses and building regulations is submitted.

Includes: fire strategy narrative, means of escape review, compartmentation principles, smoke control strategy, initial penetration schedule.

Best for: RIBA Stage 2–3, schemes preparing for building regulations submission, projects where fire strategy has not yet been formally defined.

Option B - Most Common

Design development

For teams who are in active design development and need fire strategy coordinated with evolving MEP and architectural drawings.

Includes: all Option A outputs plus coordinated penetration schedule, smoke control system specification, detection and suppression interface notes, building regulations submission support.

Best for: RIBA Stage 3–4, schemes in procurement, projects where fire strategy needs to be coordinated with detailed MEP and architectural packages.

Option C

Pre-handover readiness

For teams who are approaching completion and need final fire strategy sign-off, pre-occupation inspection support and handover documentation.

Includes: final fire strategy review, inspection readiness check, O&M fire documentation review, approved inspector liaison.

Best for: pre-handover stage, schemes approaching occupation, projects with outstanding building regulations fire conditions.

Not sure which option fits your stage?

Who it's for and when to use it

Who it’s for:

Fire strategy reports are used by architects, developers and M&E design teams who need fire compliance resolved as part of the design process rather than as a standalone document issued to the approved inspector.

We work with teams on residential, commercial, mixed-use and change-of-use projects where the fire strategy needs to be coordinated with the MEP design, the compartmentation layout and the smoke control system from an early stage.

Best timing:

The most effective time to commission a fire strategy report is at RIBA Stage 2, when the compartmentation layout, escape route strategy and smoke control approach can still influence the floor plan and the MEP design. Identifying these requirements early means the design team can resolve them during design rather than after detailed drawings are complete.

If building regulations submission is imminent and a fire strategy has not yet been produced, we can scope a rapid-turnaround strategy to support the submission — but the options available to resolve late issues are more constrained.

Our process

1

Quick triage call

Confirm whether Fire Strategy Report is required and what ‘good’ looks like for your local authority and scheme.

2

Inputs + assumptions lock

Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.

3

Analysis + iterations

Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.

4

Planning-ready output

Produce the report in a format that slots into your submission pack cleanly and defensibly.

5

Support through queries

Respond to clarifications and help you move from submission to decision/conditions efficiently.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.

FAQs

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 3 of 4 — MEP Design & Integration

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.