Energy statements that give planners what they need to say yes

Policy-aligned, coordinated with your submission pack, and written to avoid the questions that slow decisions down.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

An energy statement for planning sets out how a development will meet the local authority’s energy policy requirements. It defines the energy strategy, quantifies carbon reduction measures, and demonstrates compliance with the relevant policy framework. SustainPlan produces statements that align assumptions across the submission pack and reduce the risk of planning questions.

You need this if your local authority’s validation checklist or planning officer has identified an energy statement as a requirement. 

You need this if you want your energy strategy to be deliverable — not just compliant on paper but viable through design and construction.

Energy statements for planning are required by most local planning authorities in England when residential or commercial developments reach the threshold set by local planning policy or London Plan requirements. The energy statement must demonstrate compliance with the hierarchy of passive design, energy efficiency, low and zero carbon technologies, and connection to heat networks where viable. 

For schemes in Greater London, the energy statement must address the Be Lean, Be Clean, Be Green hierarchy and quantify regulated carbon emissions against Part L baseline. SustainPlan produces energy statements for planning that are coordinated with the SAP calculations, SBEM calculations, and overheating assessment — so every figure is consistent across the full planning submission

What the scope covers?

“Used by architects, developers and planning consultants across the UK on residential, commercial, mixed-use and infrastructure projects — from pre-application energy strategy through to London Plan compliance and condition discharge.”

What you get

What we need from you

Technical deep dive

01

Local authority energy policy alignment

Energy requirements vary significantly between local authorities — some follow the national framework, others apply borough-specific carbon reduction targets or renewable energy thresholds. We scope each statement to the specific policy position of your authority before we write a single line.

02

Energy hierarchy: fabric first, then systems, then renewables

Planning authorities expect to see the energy hierarchy applied in a demonstrable sequence — not just stated. We document the fabric performance baseline, the mechanical system choices, and the renewable energy contribution in a way that gives the case officer a clear audit trail.

03

Carbon reduction pathway and compliance quantification

Where policy requires a percentage carbon reduction above Part L or a net zero pathway, we quantify the gap and the measures used to close it. The numbers in the energy statement align with any SAP or SBEM modelling outputs so the submission reads consistently.

04

London Plan energy compliance (where applicable)

London Plan energy requirements — including the be lean, be clean, be green hierarchy and borough-level carbon targets — are more detailed than national policy and require a separate London Plan energy statement on larger schemes. We flag when a standard energy statement is insufficient.

05

Deliverability and design team alignment

An energy statement that commits to measures the design team cannot deliver creates conditions that are hard to discharge. We check assumptions against the specification before finalising the narrative and flag conflicts early so they can be resolved during design.

06

Submission pack consistency

Floor areas, construction types and building uses must read consistently across the energy statement, sustainability statement, and any modelling outputs. We cross-reference assumptions at draft stage so planning officers receive a coherent pack rather than a set of documents that contradict each other.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Policy check and energy narrative

For teams who need to understand what the authority expects before committing to a full energy strategy.

Includes: policy requirement confirmation, energy hierarchy framing, indicative compliance position, scoping note.

Best for: pre-application stage, early feasibility, schemes where the energy policy position is unclear.

Option B - Most Common

Full planning energy statement

For teams who need a complete, submission-ready energy statement that aligns with the rest of the planning pack.

Includes: all Option A outputs plus full energy statement document, carbon reduction quantification, compliance pathway, query support through decision.

Best for: full planning applications, schemes with specific carbon targets, London and non-London authorities with defined energy policy.

Option C

Condition discharge and post-consent energy support

For teams who have consent but need to discharge energy conditions or update the energy position following design changes.

Includes: condition review, updated energy narrative, liaison with the case officer, approval-ready outputs.

Best for: post-consent stage, schemes where energy conditions need updating due to design or specification changes.

Not sure which option fits your stage?

Who it's for and when to use it

Who it’s for:

Energy statements are used by architects, developers and planning consultants who need to demonstrate policy compliance as part of a planning application. We work with teams at all scales — from single dwellings where Part L is the primary benchmark to large mixed-use schemes with London Plan obligations and net zero carbon commitments.

The scope is always set to match the authority’s expectations, not a generic template.

Best timing:

The most effective time to commission an energy statement is at RIBA Stage 2, when the energy strategy can still influence the specification, systems selection and fabric performance. Waiting until Stage 3 or later often means the energy statement is written to justify decisions already made, rather than to shape them.

If you’re post-consent and need to discharge an energy condition, that is a different scope — we can support it, but the options are narrower.

Our process

1

Quick triage call

Confirm whether Energy Statement is required and what ‘good’ looks like for your local authority and scheme.

2

Inputs + assumptions lock

Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.

3

Analysis + iterations

Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.

4

Planning-ready output

Produce the report in a format that slots into your submission pack cleanly and defensibly.

5

Support through queries

Respond to clarifications and help you move from submission to decision/conditions efficiently.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.

FAQs

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 1 of 4 — Feasibility & Planning

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.