Electrical design that stays coordinated through to handover

LV distribution, emergency lighting, EV charging and controls — coordinated with MEP and energy modelling so the design is compliant and buildable.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

Electrical design for buildings covers LV distribution, containment, emergency lighting, power and controls — coordinated across all building services disciplines. SustainPlan delivers electrical design that aligns with energy modelling targets, coordinates with the MEP team, and produces specification-ready outputs that contractors can procure and install without ambiguity.

You need this if your project needs electrical design coordinated with MEP — not issued in isolation after the mechanical and structural packages are fixed. 

You need this if energy performance targets require lighting power and controls to be defined early enough to feed SBEM or TM54 modelling.

Electrical design for buildings encompasses distribution boards, incoming supply strategy, busbar sizing, protective device coordination, emergency lighting, fire detection, data and communications, and the integration of renewable energy systems including solar photovoltaic arrays and electric vehicle charging infrastructure. Design must comply with BS 7671 — the IET Wiring Regulations — and be coordinated with the mechanical design, the structural engineer, and the architectural team from RIBA Stage 2 onwards to avoid late-stage conflicts over containment routes, riser space, and plant room allocations. SustainPlan produces electrical design as part of an integrated MEP design service — coordinating load calculations, distribution strategy, and energy metering requirements with the SBEM calculations compliance strategy and any BREEAM energy or transport credits.

What the scope covers?

"Used by architects, developers and project teams across the UK on planning submissions from initial feasibility through to discharge of conditions."

What you get

What we need from you

Technical deep dive

01

Load scheduling and LV strategy

Accurate load scheduling early prevents the most common electrical design failure: a switchgear or incoming supply specification that cannot accommodate the actual connected load. We build load schedules from realistic occupancy and system assumptions, not worst-case diversity factors that inflate capex and lead to oversized infrastructure.

02

Containment strategy and MEP coordination

Containment routing is where electrical design most frequently conflicts with mechanical services. We map cable routes, tray sizes and riser allocations against the ductwork and pipework strategy early, so the coordination is resolved before detailed drawings are produced rather than on site during first-fix.

03

Emergency lighting and life safety

Emergency lighting design must be coordinated with the fire strategy, escape route layout and detection system philosophy. We define the emergency lighting scheme in alignment with BS 5266 requirements and the fire strategy report so that life safety compliance is built into the design rather than retrofitted after a late fire review.

04

EV charging, metering and smart systems

EV charging infrastructure, metering strategy and smart building systems require early electrical design decisions: incoming capacity, protection philosophy, sub-metering hierarchy and BMS integration points. Ambiguity at specification stage leads to poor handover outcomes and expensive retrofits. We document these requirements clearly so the contractor can price and install them correctly.

05

Lighting controls and energy performance

Lighting power density and controls strategy directly affect SBEM and TM54 modelling outcomes. We coordinate the electrical design with the energy modelling assumptions so that the controls scheme specified is the one that was modelled — avoiding the gap between the modelled performance and the as-installed system that leads to poor in-use outcomes.

06

Handover, testing and O&M documentation

Electrical systems require test documentation, O&M manuals and commissioning records that align with the design intent. We design with handover in mind: test points, labelling conventions, and documentation structure that make it straightforward to demonstrate compliance and to operate the building after occupation.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Early-stage strategy

For teams who need LV strategy, load scheduling and containment principles confirmed before detailed design progresses.

Includes: load schedule, LV distribution strategy, containment principles, key interface notes.

Best for: RIBA Stage 2, schemes at early design stage, projects where electrical capacity or LV strategy is unconfirmed.

Option B - Most Common

Design development

For teams who are in active design development and need coordinated electrical drawings, specifications and package-ready outputs.

Includes: all Option A outputs plus coordinated containment routing, emergency lighting design, controls specification, procurement-ready package, query support.

Best for: RIBA Stage 3–4, schemes in procurement or construction, projects where the electrical package needs to be specification-ready

Option C

Pre-handover readiness

For teams who are approaching handover and need final electrical sign-off, testing documentation and O&M structure.

Includes: final electrical check, test documentation structure, O&M manual format, handover readiness review.

Best for: pre-handover stage, schemes approaching practical completion, projects with outstanding electrical certification requirements.

Not sure which option fits your stage?

Who it's for and when to use it

Who it’s for:

Electrical design is used by architects, M&E contractors, developers and project managers who need building electrical systems designed, coordinated and specified as part of the wider MEP package. We work with teams across commercial, residential, mixed-use and fit-out projects where the electrical design needs to be coordinated with the mechanical, fire and structural packages rather than developed in isolation.

The scope is always structured around the project’s actual electrical requirements — not a generic service that ignores the constraints of the specific procurement route or programme.

Best timing:

The most effective time to commission electrical design is at RIBA Stage 2, when load scheduling and LV strategy can still influence the incoming supply specification, switchgear sizing and plantroom layout. Decisions made at this stage have cost implications that compound as the project develops.

Waiting until Stage 3 or later means the electrical design is constrained by decisions already made about the building’s infrastructure that may need to be revisited.

Our process

1

Quick triage call

Confirm whether Electrical Design is required and what ‘good’ looks like for your local authority and scheme.

2

Inputs + assumptions lock

Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.

3

Analysis + iterations

Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.

4

Planning-ready output

Produce the report in a format that slots into your submission pack cleanly and defensibly.

5

Support through queries

Respond to clarifications and help you move from submission to decision/conditions efficiently.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.

FAQs

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 3 of 4 — MEP Design & Integration

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.