For architects, developers and project teams: daylight and sunlight assessments scoped proportionately and coordinated with your planning submission pack.
Tell us about your project and we’ll respond within one working day.
A daylight and sunlight assessment evaluates how a proposed development affects natural light to neighbouring properties and within the scheme itself, using established BRE guidance as the framework. SustainPlan scopes the assessment proportionately, sequences it to protect design flexibility, and coordinates assumptions with the wider planning pack to reduce the risk of conditions and amenity objections.
You need this if your scheme may affect neighbouring amenity and planning evidence is expected.
You need this if massing, set-backs or glazing strategy are still evolving and you want to protect your options.
Daylight and sunlight assessments are commissioned when a proposed development has the potential to affect the amenity of neighbouring properties or when the internal daylighting of new residential units needs to be demonstrated. Assessments follow BRE Report 209 methodology, applying the Vertical Sky Component, Annual Probable Sunlight Hours, and No Sky Line tests.
SustainPlan carries out daylight and sunlight assessments for planning applications across England and Wales — from single residential extensions to large mixed-use schemes in dense urban environments. Our reports are produced to a standard accepted by local planning authorities and designed to withstand scrutiny from objectors and expert witnesses in planning appeals.
"Used by architects, developers and planning consultants across the UK on schemes from initial feasibility through to planning submission and condition discharge."
We confirm any additional inputs after a quick triage call.
Daylight and sunlight assessments use BRE 209 as the primary reference framework. We select the appropriate methodology — Vertical Sky Component, No-Sky Line, Annual Probable Sunlight Hours — based on the scheme type, site context and what the planning authority expects.
Impacts on existing neighbouring windows and gardens are the primary concern for planning officers. We assess each affected receptor against BRE targets and identify where impacts are likely to be material — so the design team can respond during design rather than at planning inquiry.
Planning officers increasingly expect evidence that the proposed development itself will achieve adequate daylight for future occupants. We assess internal daylight using Average Daylight Factor and Daylight Distribution methods and identify rooms or units at risk before the layout is fixed.
Massing, set-backs and glazing ratios all affect daylight and sunlight outcomes. We run sensitivity tests during design development so the team can see the daylight implications of design options before committing to a scheme that will fail the assessment at planning stage.
Gardens, terraces and communal outdoor spaces must receive adequate sunlight to meet the BRE guidance on annual probable sunlight hours. We assess these spaces and identify where orientation, massing or landscaping choices are creating sunlight deficits that planning officers will question.
Glazing ratios affect daylight, overheating risk and energy performance simultaneously. We coordinate assumptions across the daylight assessment, overheating assessment and energy statement so the planning pack does not contain contradictory commitments on glazing or shading strategy.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For teams who need to understand whether an assessment is required and whether massing choices carry amenity risk — before detailed design locks.
We review the scheme, site context and local authority expectations, and give you a clear steer on whether a full assessment is needed, what level is proportionate, and how sequencing early protects your design flexibility.
For teams preparing a planning submission where daylight and sunlight evidence is required or expected.
We deliver the full planning-ready assessment — BRE-referenced analysis, neighbouring amenity review, assumptions log, and design sensitivity notes. Coordinated with your energy and noise reports. Includes one draft and one final stage.
For teams responding to a planning condition requiring daylight or sunlight evidence post-consent.
We scope the condition requirements, produce the targeted evidence, and prepare the submission for condition discharge — coordinated with any other conditions being discharged at the same time.
Daylight and sunlight assessments are most commonly commissioned by architects managing planning risk on schemes that affect neighbouring amenity, and by developers whose planning consultant has identified it as a validation requirement.
Planning consultants preparing full submission packs also commission this service to ensure the assessment is coordinated with energy and noise reports rather than produced in isolation.
The most useful time to commission a daylight and sunlight assessment is while massing, set-backs and glazing ratios are still flexible — typically RIBA Stage 2, before design development locks the scheme.
Commissioning at this stage means the outputs can shape design decisions rather than simply document a problem after the fact. If the design is already fixed or a condition has landed, we can still help — the scope shifts to condition discharge and the emphasis moves from design optimisation to evidence and risk management.
Confirm whether Daylight and sunlight assessment is required and what ‘good’ looks like for your local authority and scheme.
Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.
Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.
Produce the report in a format that slots into your submission pack cleanly and defensibly.
Respond to clarifications and help you move from submission to decision/conditions efficiently.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.
Cost depends on the scheme size, number of neighbouring receptors, and level of analysis required. A proportionate scope for a straightforward planning submission is significantly less than a detailed multi-receptor study for a large scheme. We confirm scope and a fixed fee after a short triage call. Start a conversation to get a clear picture quickly.
The most useful time is while massing, set-backs and glazing ratios are still flexible — typically RIBA Stage 2. At that stage, the outputs can shape design decisions rather than simply document a problem. If you wait until design is fixed or a condition has already landed, we can still help, but the scope and emphasis change.
It depends on the scheme, site context and local authority. Common triggers include schemes that affect neighbouring amenity, sites in sensitive contexts, and local authority validation requirements. The fastest route to an answer is a short call — we can usually confirm within the triage call whether an assessment is needed and at what level.
Glazing ratios and massing decisions affect both daylight performance and overheating and energy outcomes. We coordinate assumptions across daylight, overheating assessment and energy statement so the reports are consistent and do not create contradictions in the submission pack.
We typically need the site address, local authority, massing or layout drawings as available, and any pre-application feedback or validation requirements. You do not need to have everything ready to start a conversation — we confirm the full inputs list during triage.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk