Circular Economy Statement — Policy-Aligned, Planning-Ready, Deliverable

Policy-aligned circular economy statements that strengthen your planning submission — clear commitments, practical actions and joined-up coordination with energy and carbon.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

A circular economy statement sets out how your project will reduce material demand, design for adaptability, prioritise reuse and manage construction waste — translated into planning-ready commitments.

SustainPlan produces coordinated statements aligned with energy and carbon reporting, proportionate to scheme type.

You need this if...

Your local authority validation checklist requires a circular economy statement. 

You need commitments that are planning-ready and deliverable through construction. 

Your submission needs a circular narrative coordinated with energy and whole life carbon.

Circular economy statements are required by the Greater London Authority for major developments in London and are increasingly requested by other planning authorities in line with national planning policy on sustainable construction. The statement must demonstrate how the project will minimise waste, reuse materials, design for disassembly, and reduce embodied carbon across the construction process. Requirements vary between planning authorities — some follow the GLA’s circular economy guidance directly, others set their own expectations through the Local Plan. SustainPlan produces circular economy statements that satisfy planning requirements and are coordinated with the whole life carbon assessment and BREEAM materials credits — ensuring a consistent position on material sourcing, waste minimisation, and resource efficiency across all submitted documentation.

What the scope covers?

"Producing circular economy statements for planning submissions across the UK — coordinated with energy, carbon and sustainability reporting from feasibility to consent."

What you get

What we need from you

Technical deep dive

01

Policy and Scheme Context

We confirm what your authority requires and what level of commitment is proportionate for your scheme type. Requirements vary significantly — generic statements attract scrutiny; scheme-specific ones do not.

02

Material Efficiency and Adaptability

We translate design decisions into circular outcomes — material intensity, modularity, durability assumptions and design moves that support future adaptability. These are documented as auditable commitments, not general principles

03

Reuse and Recycled Content Strategy

We set proportionate commitments around reuse opportunities and recycled content, with a clear evidence pathway so commitments made at planning can be tracked through procurement and construction.

04

Construction Waste and Logistics

We describe practical waste minimisation measures, diversion targets and how delivery teams will track performance. Where a site waste management plan is expected, we align circular commitments accordingly.

05

End-of-Life and Recovery Planning

We address maintenance cycles, disassembly potential and salvage documentation — framing end-of-life strategy in terms planners can assess and conditions can reference without creating undeliverable obligations.

06

Coordination with Energy and Carbon

Circular measures affect material quantities, replacement cycles and operational assumptions in whole life carbon assessments. We align across both documents so the submission pack reads as a coherent, cross-referenced package.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Proportionate Planning Statement

For: For schemes where a circular economy statement is a validation requirement at a standard level.

You receive: Planning-ready statement — policy context, commitments, material efficiency and waste strategy.

Option B - Most Common

Coordinated with Energy and Carbon

For: For projects where circular economy, energy and whole life carbon are all required and need cross-referenced coordination.

You receive: Full statement coordinated with energy statement and whole life carbon assessment — consistent assumptions throughout.

Option C

Higher-Scrutiny

For: For schemes in authorities with detailed circular economy policy (e.g., London) or with sustainability-led planning strategies.

You receive: Enhanced statement with detailed material strategy, quantified targets and cross-report coordination.

Not sure whether your scheme needs a circular economy statement?

Who it's for and when to use it

Who it’s for:

SustainPlan produces circular economy statements for architects, developers and project managers who need a planning-ready circular narrative.

Most commonly used when local authority validation requirements include a circular economy statement or when sustainability policy is a point of planning scrutiny.

Best timing:

Commission before planning submission, once the design approach and material strategy are broadly understood.

Where a whole life carbon assessment or energy statement is also required, commissioning together reduces coordination time and prevents contradictions across the submission pack.

Our process

1

Scope from policy

Confirm what the authority expects and what level of commitment is proportionate.

2

Gather design inputs

Request the minimum inputs needed to produce a robust, scheme-specific statement.

3

Draft statement

Produce a planning-ready statement with clear actions, responsibilities and measurable commitments.

4

Coordinate across the submission

Align circular commitments with energy and carbon reporting to avoid contradictions.

5

Support through queries

Help with planning clarifications and keep commitments achievable through delivery.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 2 of 4 — Design & Compliance

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.