Clash detection that drives decisions, issue tracking that closes actions, and coordinated outputs your team can actually build from.
Tell us about your project and we’ll respond within one working day.
BIM coordination keeps MEP, architecture and structural models aligned throughout design and construction. SustainPlan manages clash detection, assigns issue ownership and produces coordinated outputs that contractors can build from without RFIs.
The result is fewer late changes, fewer programme slips, and a smoother route to practical completion.
You need this if clashes are being found in site — or if model coordination hasn’t been formally managed and procurement is approaching.
You need this if your project has complex MEP interfaces — risers, plantrooms, ceiling zones — that need resolving before detailed drawings are issued.
BIM coordination — Building Information Modelling coordination — is the structured process of aligning architectural, structural, and mechanical and electrical models to identify and resolve clashes before they become site problems. Coordination failures between structural elements, mechanical plant, ductwork, pipework, and electrical containment are one of the primary causes of programme delay and cost overrun on medium and large construction projects. SustainPlan manages the BIM coordination process across the MEP disciplines, running clash detection, facilitating coordination meetings, and maintaining the coordinated federated model to the BIM execution plan. Integration with the sustainability and energy models ensures that plant room sizing, rooftop equipment, and service routes are resolved against the whole-building energy strategy, not in isolation from it.
"Used by architects, contractors and project managers across the UK on commercial, residential and mixed-use schemes — from RIBA Stage 2 coordination strategy through to pre-handover model sign-off."
Clash reports only add value if they drive clear resolution. We triage issues by severity, assign owners, and track closure so coordination becomes a managed process rather than a growing list of comments that nobody acts on.
The highest-risk coordination failures are MEP-related: riser conflicts, plantroom access, ceiling zone congestion, and service penetrations through compartment walls. We focus effort on these interfaces first because they are the ones most likely to generate expensive site rework.
Coordination breaks down when teams work from different model versions. We establish an agreed exchange schedule, a clear responsibility matrix for model ownership, and a version control protocol that keeps the federated model current without creating bottlenecks.
The goal is not a clash-free model — it is a set of coordinated drawings and specifications that the contractor can procure and install without ambiguity. We structure outputs around build sequence so that packages are clear, annotated, and free from the interface conflicts that generate change orders.
Coordination must not drift from the assumptions used in energy and compliance modelling. Where SBEM calculations, TM54 assessments or overheating models have been produced, we keep key inputs — plantroom sizes, duct routes, system types — aligned with the coordinated design so reports remain valid as the model develops.
The measurable outcome of good BIM coordination is fewer RFIs, fewer programme slips, and fewer expensive late changes. We track the risks that coordination decisions are managing so the project team can see what has been resolved and what remains open
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For teams who need to establish coordination protocols and resolve early model conflicts before detailed design progresses.
Includes: coordination protocol, clash detection scope, issue register setup, MEP interface mapping.
Best for: RIBA Stage 2–3, projects approaching detailed design, schemes where coordination has not yet been formally managed.
For teams who are in active design development and need ongoing clash detection, issue resolution and coordinated outputs.
Includes: all Option A outputs plus ongoing clash detection cycles, issue tracking and resolution, coordinated drawing issues at agreed milestones, query support.
Best for: RIBA Stage 3–4, schemes in active procurement or construction, projects where coordination has fallen behind programme.
For teams who are approaching practical completion and need final model sign-off and handover coordination.
Includes: final clash review, model sign-off against as-built intent, coordination notes for O&M pack, handover readiness check.
Best for: pre-handover stage, schemes approaching practical completion, projects requiring model sign-off before occupation.
BIM coordination is used by architects, lead designers, project managers and contractors who need MEP and architectural models to stay aligned through design and construction. We work with teams at all project scales — from smaller commercial fit-outs where coordination has been informal through to large mixed-use schemes with multiple specialist trade packages.
The scope is always structured around the project’s actual coordination risks, not a generic BIM management service.
The most effective time to establish BIM coordination is at RIBA Stage 2 to 3, before detailed drawings are produced and before procurement packages are defined. Starting at this point means coordination protocols are in place before models become complex, and clash detection cycles can be built into the programme rather than added reactively.
If coordination has already broken down — or if site RFIs are escalating — we can step in mid-project to re-establish a managed process and work through the backlog of unresolved issues.
Confirm whether BIM Coordination is required and what ‘good’ looks like for your local authority and scheme.
Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.
Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.
Produce the report in a format that slots into your submission pack cleanly and defensibly.
Respond to clarifications and help you move from submission to decision/conditions efficiently.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.
Cost depends on the scale of the project, the number of disciplines in the federated model, the frequency of coordination cycles, and the stage at which coordination starts. A short coordination protocol for a straightforward commercial scheme is significantly lighter than a full coordination service on a complex mixed-use project with multiple specialist trade packages. A scoping call is the fastest way to define what is needed and get a reliable cost.
Starting at RIBA Stage 2 to 3 is most effective because coordination protocols can be established before models become complex. Starting at Stage 4 or later is possible but limits the options available — at that point, coordination focuses on resolving issues rather than preventing them. If procurement is starting and coordination has not yet been formalised, that is usually the point at which the cost of not coordinating becomes visible.
Current drawings or federated model, design intent, programme milestones, procurement dates, and any existing issue registers or coordination notes. If specialist trade packages have already been tendered, knowing the scope boundaries of each package helps us focus coordination effort on the highest-risk interfaces.
SBEM calculations and TM54 assessments depend on specific assumptions about plant sizes, system types, duct routes and zone layouts. If those inputs change as the model is coordinated — for example, plantroom positions are moved or system types are revised — the modelling outputs may need updating. We flag those dependencies during coordination so changes are assessed before they invalidate existing reports.
Design changes are normal. The risk is unmanaged ripple effects. We use a change-control approach: document what changed, identify what it impacts across the model, update what must be revised, and confirm what can stay the same. This keeps coordination current without requiring a full restart every time a design decision changes.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk