Airtightness Testing — Pass First Time, Sign Off on Programme

UK-wide airtightness testing with clear, practical guidance — so your programme stays on track and your team knows what to do if a test fails.

Start the conversation

Tell us about your project and we’ll respond within one working day.

Upload any plans or drawings.

SustainPlan provides UK-wide airtightness testing to support Building Regulations sign-off.

We help you prepare for the test, coordinate with site, and — if you fail — diagnose the leakage path and coordinate a retest quickly. Clear results, practical guidance, joined-up with SAP calculations and SBEM calculations.

You need this if...

Building Regulations Part L requires an airtightness test before sign-off. 

You have failed a test and need fast diagnosis and retest coordination. 

You want to reduce the risk of failure before the test is booked.

Most airtightness test failures on site are not construction defects — they are coordination failures. The junctions between structural frame, floor slab, and service penetrations are where uncontrolled air paths occur, and the time to resolve them is during construction rather than on test day. SustainPlan coordinates the pre-test inspection across trades so the airtightness test is a confirmation of a known result rather than a risk event. On multi-plot residential schemes, testing is sequenced against the build programme to avoid holding up SAP calculations as-built sign-off and energy performance certificate lodgement. Less rework, faster handover, and a test result that reflects the energy performance the building was designed to deliver.

What the scope covers?

"UK-wide airtightness testing for new build residential and commercial schemes — preparation, testing, fail support and retest coordination, all in one service."

What you get

What we need from you

Technical deep dive

01

Pre-Test Preparation Guidance

Most airtightness test failures are caused by predictable issues — unsealed service penetrations, incomplete membrane laps, and door/window seals not in final condition. We share a preparation checklist so site can act before testing day.

02

Test Methodology and Standards

Testing follows ATTMA TS1 or BS EN ISO 9972, using a calibrated fan to pressurise or depressurise the building envelope. We confirm which standard applies for your project type and the result format required by Building Control.

03

Fail Diagnosis and Fix Prioritisation

If you fail, we provide a prioritised list of likely leakage sources based on the test data and site conditions — so the contractor focuses on the highest-impact fixes first rather than sealing everything indiscriminately.

04

SAP calculations and SBEM calculations Alignment

The measured airtightness value updates the as-built SAP calculations or SBEM calculations model. We coordinate the test result handover to your compliance consultant so the compliance calculation is updated and Building Regulations sign-off is not delayed.

05

Multi-Plot Scheduling

For residential developments, we schedule testing across plots to reduce site downtime and help the team learn from early results. Repeat failures on the same junction type are usually identifiable and fixable early in the programme.

06

Ventilation Testing Coordination

Tighter buildings need ventilation systems that perform as designed. Where ventilation testing is also required, we coordinate timing and site access so both tests are completed in sequence without duplicating mobilisation costs.

Scope options — choose what fits your stage

Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.

Option A

Single Plot or Unit

For: For single dwellings or single commercial units needing an airtightness test for Part L sign-off.

You receive: Test, certificate and SAP calculations/SBEM calculations input update.

Option B - Most Common

Multi-Plot Development

For: For residential or commercial developments with multiple units needing scheduled testing across the programme.

You receive: Scheduled multi-plot testing, coordinated with SAP calculations as-built, fail support and retest included.

Option C

Fail Recovery and Retest

For: For projects that have failed an airtightness test and need fast diagnosis, contractor guidance and retest.

You receive: Leakage diagnosis, fix prioritisation, retest coordination and updated compliance evidence.

Ready to book, or want advice before the test?

Who it's for and when to use it

Who it’s for:

SustainPlan provides airtightness testing for architects, developers, contractors and project managers on new build residential and commercial schemes.

Most commonly needed at practical completion when Building Control sign-off requires a tested airtightness value.

Best timing:

Book airtightness testing once the envelope is complete and all penetrations are sealed, but before final decoration.

This timing keeps leakage paths accessible and avoids the cost of reopening finishes. For multi-plot developments, schedule the first test as early as possible to catch repeatable issues.

Our process

1

Scope and booking

Confirm test standard, site address, plot count and programme dates.

2

Pre-test guidance

Issue preparation checklist to site team to reduce avoidable failure risk.

3

Testing

Attend site, pressurise/depressurise envelope and record air permeability result.

4

Reporting

Issue certificate and SAP calculations/SBEM calculations airtightness input for compliance update.

5

Fail support

If result fails, provide diagnosis notes and coordinate retest once fixes are complete.

Why this matters commercially

The cost of getting it wrong — and the value of getting it right.

The cost of getting it wrong

Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).

The benefit of a joined-up approach

Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.

FAQs

If you want the best outcome, start with a package

A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.

We provide compliance services across the planning and Building Control lifecycle, from early project advice through to final sign-off. The services above are common requirements, but more complex projects may need a more consultative approach. If you’re unsure what applies, use the options below to book a call, request a call back, or send us your project details.

Where this service fits
SustainPlan supports projects across all four stages — here’s where this service fits.Stage 4 of 4 — Handover & Existing Buildings

Let's Work Together

Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.