For architects, developers and project teams, SustainPlan provides air quality assessments that are proportionate to your scheme and coordinated with your planning pack—so submissions land cleanly
Tell us about your project and we’ll respond within one working day.
An air quality assessment for developments evaluates pollutant exposure and traffic-related emissions to support a planning application where required. SustainPlan scopes the assessment proportionately, documents assumptions clearly, and delivers a planning-ready report coordinated with your wider submission pack—reducing the risk of conditions, delays, and last-minute queries.
You need this if your local authority validation checklist requests it.
You need this if your scheme is near an Air Quality Management Area or sensitive receptors.
Air quality assessments are required by planning authorities when proposed developments are within or near Air Quality Management Areas, when the development itself will generate significant vehicular movements, or when future occupants will be exposed to elevated pollutant levels from nearby roads or industrial sources. The scope ranges from a basic air quality screening note to a full quantitative assessment to IAQM and Environmental Protection UK guidance. SustainPlan scopes the air quality assessment proportionate to your scheme and local authority requirements — confirming which pollutants require assessment, selecting the appropriate methodology, and producing outputs that satisfy the environmental health officer and planning condition requirements without unnecessary cost.
“Used by architects, developers and contractors across the UK on planning submissions from initial feasibility through to discharge of conditions.”
We confirm any additional inputs after a quick triage call.
We identify whether your site falls within or near an Air Quality Management Area and map the sensitive receptors — residential, school, healthcare — that could be affected by the development. This determines whether an assessment is required and at what level of detail.
Traffic-related nitrogen dioxide and particulate matter are the most common air quality concerns for planning applications. We quantify the change in emissions from the proposed traffic movements and assess the impact significance against local baseline conditions.
Construction activity — particularly earthworks, demolition and HGV movements — can generate dust and emissions that affect neighbouring receptors. We scope a proportionate construction air quality management plan aligned to the Institute of Air Quality Management guidance.
Where a scheme introduces new residents or other occupants close to existing emission sources, we assess pollutant exposure against UK national objectives and WHO guidelines. The assessment identifies whether mitigation measures are needed and what form they should take.
Where impacts are identified, we set out a proportionate mitigation strategy — ULEV infrastructure, construction controls, green infrastructure, or building positioning — that the planning authority can use as the basis for conditions. We design mitigation that is deliverable, not aspirational.
Air quality assumptions must align with the transport statement, energy strategy and sustainability statement. We cross-reference those documents before finalising the air quality report so the planning officer receives a consistent pack rather than reports that contradict each other on traffic movements or construction phasing.
Three entry points depending on where you are in the programme. No unnecessary scope, no gaps.
For teams who need to confirm whether an assessment is required before committing to full scope.
We review the validation checklist, scheme quantum and site context, and give you a clear answer on whether an assessment is needed, what level of detail is proportionate, and whether it can be phased to post-consent.
For teams preparing a planning submission where an assessment has been confirmed as required.
We deliver the full air quality assessment report — baseline review, impact analysis, mitigation recommendations, and coordination with your submission pack. Includes one draft and one final stage.
For teams responding to a planning condition requiring air quality evidence post-consent.
We scope the condition requirements, produce the targeted evidence, and prepare the submission to the local authority for condition discharge.
Air quality assessment for developments is most commonly commissioned by architects and planning consultants preparing a full submission pack, and by developers managing the validation requirements across a complex application.
Project managers and site promoters who need to confirm scope early — before committing to full design work — also use this service to de-risk the programme.
The most useful time to commission an air quality assessment is before the planning submission is finalised — typically at RIBA Stage 2 or 3, when the scheme quantum, layout and transport intent are established but not yet locked.
Commissioning earlier allows the assessment outputs to shape the submission narrative rather than respond to it. If a condition has already landed, we can still help — the scope and emphasis simply shifts to condition discharge rather than design optimisation.
Confirm whether Air Qulity assessment is required and what ‘good’ looks like for your local authority and scheme.
Align drawings, scope boundaries, programme dates and pack-wide assumptions to avoid contradictions.
Run the assessment, flag risks early, and iterate with the design team if changes will improve outcomes.
Produce the report in a format that slots into your submission pack cleanly and defensibly.
Respond to clarifications and help you move from submission to decision/conditions efficiently.
The cost of getting it wrong — and the value of getting it right.
Late changes are expensive because they hit multiple parties at once: rework to drawings, re-coordination between disciplines, re-pricing, and potentially delayed approvals or sign-off. Even when a single change looks small, it can cascade into other systems (plant sizing, duct routes, risers, penetrations, controls, or acoustic/fire requirements).
Our approach is to treat the building as one system. We sequence decisions so that early work reduces downstream risk. This is where SustainPlan adds value beyond a transactional deliverable: we help you choose the right work at the right time, and we coordinate how it all fits together.
A single deliverable can solve today’s problem, but planning and compliance risk often appears later. These examples show how clients bundle services to protect programme, cost and design flexibility.
These are the services most clients pair with this one — but it’s a starting point, not a fixed list. Every project is different, and the right mix depends on where you are and what you’re trying to achieve. If you’re not sure what you need, a quick call is the fastest way to find out.
Cost depends on the level of assessment required — a qualitative screening is significantly less than a detailed emissions model. We confirm scope and a fixed fee after a short triage call, so you know the number before committing. Start a conversation to get a clear picture quickly.
The most useful time is before the planning submission is finalised — typically RIBA Stage 2 or 3. Commissioning early means the outputs can shape the submission rather than simply document a problem. If a condition has already landed, we can still help, but the scope shifts to condition discharge.
They assess different environmental impacts. Air quality focuses on pollutant exposure and emissions — particularly traffic-related. Noise impact assessment addresses sound sources, receptor exposure and acoustic mitigation. They are often commissioned together because the triggers and input data overlap, and we coordinate both.
We typically need the site address, basic drawings, scheme quantum and use class, and any validation requirements or pre-application notes. We confirm any additional inputs after a quick triage call — you do not need to have everything ready to start a conversation.
Yes. Start a conversation and we will map the fastest route to condition discharge. We scope the specific condition requirements, produce the targeted evidence, and prepare the submission to the local authority — coordinated with any other conditions being discharged at the same time.
Start a conversation and we’ll map your pathway from feasibility and planning through to compliance support and sign-off.
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk