Modern London commercial buildings with glass office towers and cranes representing urban development and construction.

An Energy statement is planning evidence describing energy and carbon performance. A London Plan energy statement is the Greater London variant aligned to London Plan policy expectations and borough requirements. The fastest route is early scope confirmation—so you produce the right report at the right level of detail without rework.

Plain-English explanation

Both documents explain how a project meets planning energy policy. The difference is the policy framework and expected content depth.

Who typically needs a London Plan energy statement

Projects in Greater London, or where a borough’s planning expectations reference London Plan policy, typically require this variant.

What information you need to start

Early assumptions can be used, but clarity improves with a design narrative and key specs.

  • Site location and planning context.
  • Proposed use, areas and massing.
  • Fabric/MEP strategy assumptions.
  • Any renewable feasibility narrative.

Common pitfalls

Most rework happens when the wrong scope is produced for the authority.

  • Producing a standard Energy statement for a London borough when a London Plan format is expected.
  • Leaving energy narrative until submission.
  • Not coordinating with other planning reports.

Insights from the Field

Early scoping against borough expectations reduces RFIs and planning conditions. The best results happen when energy narrative is coordinated with daylight, noise and transport where required.

How this typically bundles with other services

Energy statement

London Plan energy statement

Planning requirements audit

Daylight and sunlight assessment

Whole life carbon assessment

FAQ

No—it depends on scheme type and local policy. A planning requirements audit confirms likely requirements.

Often yes, but it depends on borough expectations and scheme scope. We confirm this early.

Yes—energy statement often sits alongside daylight, noise, air quality and others (where required).

Yes—UK-wide (including London).

Yes—feasibility narrative is often part of the planning energy story.

Clear early evidence can reduce conditions/RFIs in many contexts.

Yes—early narrative reduces redesign and planning churn.

Source

https://www.gov.uk/guidance/planning-practice-guidance