From feasibility and planning through modelling, engineering coordination and sign-off, SustainPlan supports commercial offices & fit-out projects with clear scope, joined-up delivery and fewer late-stage surprises.
SustainPlan helps commercial offices & fit-out teams plan, model and deliver compliance without firefighting. We map what’s required, sequence deliverables, and coordinate work across sustainability, modelling and engineering so decisions land early enough to protect programme, cost and comfort.
Most briefs fail at the same point: requirements land late, the design team scrambles, and cost/programme risk increases. We prevent that by clarifying scope early and packaging adjacent work.
Single deliverables solve today’s issue. Packages reduce rework and make approvals easier. Examples below show common bundle patterns.
For projects needing performance modelling and operational energy alignment without late-stage disruption.
Includes (typical):
For teams needing joined-up MEP strategy and compliance outcomes (not disconnected reports).
Includes (typical):
Clarify what’s required, de-risk decisions, and strengthen the planning submission.
We confirm what’s needed now vs later and propose a packaged route.
SBEM calculations, TM54 operational energy assessment, MEP coordination and planning reports—sized to the project stage.
We respond to design changes or conditions without restarting from scratch.
We help answer queries and provide supporting info where needed.
For repeat clients we standardise templates and pricing matrices.
Yes. SBEM calculations can be structured around shell & core, CAT A and CAT B, and refurbishment/fit-out scenarios. We align deliverables to programme to avoid late changes.
TM54 operational energy assessment estimates operational energy using realistic profiles, supporting targets and design decisions beyond compliance modelling.
Yes. We support MEP design strategy and coordination, linking decisions to SBEM calculations, TM54 and comfort outcomes.
Yes. Overheating assessment can be used as an entry point; we advise the appropriate route based on building type, use and programme.
We scope early, lock inputs, and sequence modelling and coordination so procurement isn’t working from assumptions that change later.
Yes. We routinely coordinate across multiple stakeholders and clarify responsibilities so deliverables don’t fall between parties.
Yes. Fire strategy report can be coordinated with MEP and compliance outputs so the overall approach stays consistent.
Yes. Existing building EPC commercial and Display Energy Certificate (DEC) where applicable.
Once we have drawings/spec and intended use, we can confirm scope quickly and prioritise the items that unblock programme.
Use the triage page: Help me choose (Not sure what you need?)
Our experienced consultants are all members of relevant trade accreditation schemes, including Elmhurst Energy, IES, and ECMK, to name a few. We pride ourselves on being one of the UK’s leading sustainability and energy consultancies, providing expertise in complex building compliance.





SustainPlan Ltd
71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
0333 772 0140
info@sustainplan.co.uk
Terms & Conditions | Privacy Statement | Sitemap | SustainPlan Company number 17085854.
Website by rockhopperdigital.co.uk